Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,034
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0264 # 01 Y:2007 | 01 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,680 | $50,000 | Implemented |
LE0264 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,103 | $2,500 | Implemented |
LE0264 # 03 Y:2007 | 03 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $4,204 | $2,000 | Implemented |
LE0264 # 04 Y:2007 | 04 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,727 | $2,250 | Not Implemented |
LE0264 # 05 Y:2007 | 05 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,084 | $500 | Implemented |
LE0264 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,514 | $200 | Not Implemented |
LE0264 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,184 | $2,500 | Implemented |
LE0264 # 08 Y:2007 | 08 | 2007 | USE SYNTHETIC LUBRICANT | $3,151 | $500 | Not Implemented |
LE0264 # 09 Y:2007 | 09 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,674 | $5,000 | Not Implemented |
LE0264 # 10 Y:2007 | 10 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,288 | $1,000 | Implemented |
LE0264 # 11 Y:2007 | 11 | 2007 | INSTALL OCCUPANCY SENSORS | $3,069 | $750 | Not Implemented |
UD0755 # 01 Y:2007 | 01 | 2007 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $73,500 | $147,000 | Implemented |
UD0755 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $57,728 | $10,396 | Implemented |
UD0755 # 03 Y:2007 | 03 | 2007 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $49,140 | $253,091 | Not Implemented |
UD0755 # 04 Y:2007 | 04 | 2007 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $46,585 | $42,000 | Not Implemented |
UD0755 # 05 Y:2007 | 05 | 2007 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $33,617 | $337,437 | Not Implemented |
UD0755 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,952 | $19,500 | Implemented |
UD0755 # 07 Y:2007 | 07 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $12,600 | $15,000 | Implemented |
UD0755 # 08 Y:2007 | 08 | 2007 | USE POWER DURING OFF-PEAK PERIODS | $12,404 | $0 | Not Implemented |
UD0755 # 09 Y:2007 | 09 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,340 | $2,000 | Implemented |
UD0755 # 10 Y:2007 | 10 | 2007 | USE OPTIMUM THICKNESS INSULATION | $4,545 | $16,005 | Not Implemented |
UD0755 # 11 Y:2007 | 11 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $2,520 | $0 | Not Implemented |
UD0755 # 12 Y:2007 | 12 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,928 | $42,500 | Implemented |
GT0833 # 01 Y:2006 | 01 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $870,069 | $100,000 | Not Implemented |
GT0833 # 02 Y:2006 | 02 | 2006 | ELIMINATE/REDUCE AN OPERATION | $137,445 | $0 | Not Implemented |