Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
945
matching recommendationsNAICS | 325211 | Plastics Material and Resin Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0664 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,056 | $426 | n/a |
WV0664 # 09 Y:2024 | 09 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $382 | $328 | n/a |
WV0664 # 01 Y:2024 | 01 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,899 | $1,019 | n/a |
WV0664 # 07 Y:2024 | 07 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $535 | $1,139 | n/a |
WV0664 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $911 | $1,030 | n/a |
WV0664 # 06 Y:2024 | 06 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $792 | $1,500 | n/a |
WV0664 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $391 | $222 | n/a |
WV0664 # 10 Y:2024 | 10 | 2024 | INSULATE BARE EQUIPMENT | $121 | $293 | n/a |
WV0664 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,469 | $12,134 | n/a |
WV0664 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $2,777 | $3,541 | n/a |
UL2405 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,858 | $3,659 | n/a |
UL2405 # 10 Y:2024 | 10 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,845 | $13,000 | n/a |
UL2405 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,806 | $233,239 | n/a |
UL2405 # 08 Y:2024 | 08 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,710 | $0 | n/a |
UL2405 # 07 Y:2024 | 07 | 2024 | INCREASE AMOUNT OF CONDENSATE RETURNED | $139,372 | $168,400 | n/a |
UL2405 # 09 Y:2024 | 09 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,682 | $13,000 | n/a |
UL2405 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $1,107 | $3,037 | n/a |
UL2405 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $699 | $0 | n/a |
UL2405 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,190 | $4,575 | n/a |
UL2405 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $15,621 | $11,018 | n/a |
UA0285 # 06 Y:2024 | 06 | 2024 | OPTIMIZE PLANT POWER FACTOR | $20,619 | $5,049 | n/a |
UA0285 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $682 | $250 | n/a |
UA0285 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $461 | $116 | n/a |
UA0285 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $117,423 | $1,498,840 | n/a |
UA0285 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $159 | $301 | n/a |