Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
981
matching recommendationsNAICS | 325211 | Plastics Material and Resin Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8418 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,034 | $35,000 | n/a |
LT8418 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $1,816 | $2,450 | n/a |
LT8418 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,083 | $8,430 | n/a |
LT8418 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,113 | $0 | n/a |
LT8418 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,288 | $104,233 | n/a |
DL0248 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,209 | $291 | n/a |
DL0248 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $771 | $736 | n/a |
DL0248 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,995 | $4,980 | n/a |
DL0248 # 05 Y:2025 | 05 | 2025 | USE OPTIMUM TEMPERATURE | $1,534 | $550 | n/a |
DL0248 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,139 | $10,680 | n/a |
DL0248 # 01 Y:2025 | 01 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,580 | $0 | n/a |
DL0248 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $5,964 | $373 | n/a |
UD1096 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,210 | $242,106 | n/a |
UD1096 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,767 | $6,096 | n/a |
UD1096 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,551 | $5,809 | n/a |
UD1096 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $407 | $0 | n/a |
UD1096 # 03 Y:2024 | 03 | 2024 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $10,522 | $1,061 | n/a |
UD1096 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $780 | $872 | n/a |
UD1096 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,966 | $0 | n/a |
CM1033 # 03 Y:2024 | 03 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,707 | $1,549 | n/a |
CM1033 # 06 Y:2024 | 06 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $97 | $50 | n/a |
CM1033 # 04 Y:2024 | 04 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,189 | $7,205 | n/a |
CM1033 # 02 Y:2024 | 02 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,123 | $2,092 | n/a |
CM1033 # 05 Y:2024 | 05 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $29,541 | $8,000 | n/a |
CM1033 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $95,638 | $904,044 | n/a |