Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
945
matching recommendationsNAICS | 325211 | Plastics Material and Resin Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0096 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,715 | $39,573 | Implemented |
UA0096 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $1,997 | $545 | Implemented |
UA0096 # 05 Y:2013 | 05 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $3,456 | $1,320 | Implemented |
UA0096 # 06 Y:2013 | 06 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $766 | $8 | Not Implemented |
UA0096 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $485 | $400 | Not Implemented |
UA0096 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $321 | $1,000 | Not Implemented |
NC0461 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $163,689 | $410,000 | Not Implemented |
NC0461 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,912 | $7,160 | Implemented |
NC0461 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $81,960 | $300,000 | Not Implemented |
NC0461 # 04 Y:2012 | 04 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $24,541 | $2,400 | Implemented |
NC0461 # 05 Y:2012 | 05 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $84,150 | $40,000 | Implemented |
NC0461 # 06 Y:2012 | 06 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,695 | $0 | Implemented |
NC0461 # 07 Y:2012 | 07 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $41,556 | $15,000 | Not Implemented |
NC0461 # 08 Y:2012 | 08 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $458,904 | $314,375 | Implemented |
SU0321 # 01 Y:2012 | 01 | 2012 | REDUCE VENTILATION AIR | $5,156 | $9,920 | Not Implemented |
SU0321 # 02 Y:2012 | 02 | 2012 | UPGRADE OBSOLETE EQUIPMENT | $206 | $669 | Implemented |
SU0321 # 03 Y:2012 | 03 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $124 | $395 | Implemented |
SU0321 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,346 | $123,757 | Implemented |
SU0321 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $955 | $4,144 | Implemented |
SU0321 # 06 Y:2012 | 06 | 2012 | OPTIMIZE PLANT POWER FACTOR | $7,620 | $38,838 | Not Implemented |
SU0321 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,284 | $1,655 | Implemented |
SU0321 # 08 Y:2012 | 08 | 2012 | ELIMINATE/REDUCE AN OPERATION | $2,320 | $4,530 | Implemented |
MI0223 # 01 Y:2012 | 01 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $40,345 | $71,843 | Not Implemented |
MI0223 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,827 | $10,160 | Not Implemented |
MI0223 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,776 | $14,480 | Not Implemented |