Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 325211 | Plastics Material and Resin Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0718 # 05 Y:2016 | 05 | 2016 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $10,555 | $1,800 | Not Implemented |
AM0718 # 04 Y:2016 | 04 | 2016 | USE SYNTHETIC LUBRICANT | $28,832 | $0 | Implemented |
AM0718 # 03 Y:2016 | 03 | 2016 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $65,900 | $400,000 | Not Implemented |
AM0718 # 02 Y:2016 | 02 | 2016 | OPTIMIZE PLANT POWER FACTOR | $53,431 | $280,072 | Not Implemented |
AM0718 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $123,800 | $195,000 | Not Implemented |
AM0587 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,460 | $21,600 | Implemented |
AM0587 # 09 Y:2010 | 09 | 2010 | USE SYNTHETIC LUBRICANT | $980 | $0 | Not Implemented |
AM0587 # 08 Y:2010 | 08 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,521 | $560 | Implemented |
AM0587 # 07 Y:2010 | 07 | 2010 | INSTALL SKYLIGHTS | $2,550 | $2,030 | Not Implemented |
AM0587 # 06 Y:2010 | 06 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,250 | $500 | Implemented |
AM0587 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,760 | $42 | Not Implemented |
AM0587 # 04 Y:2010 | 04 | 2010 | OPTIMIZE PLANT POWER FACTOR | $5,087 | $21,130 | Not Implemented |
AM0587 # 03 Y:2010 | 03 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,760 | $1,030 | Implemented |
AM0587 # 01 Y:2010 | 01 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $8,000 | $5,000 | Implemented |
AM0475 # 01 Y:2004 | 01 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $19,000 | $650 | Implemented |
AM0475 # 12 Y:2004 | 12 | 2004 | INSULATE BARE EQUIPMENT | $450 | $60 | Not Implemented |
AM0475 # 11 Y:2004 | 11 | 2004 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $572 | $699 | Not Implemented |
AM0475 # 10 Y:2004 | 10 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,740 | $425 | Implemented |
AM0475 # 09 Y:2004 | 09 | 2004 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,600 | $12,500 | Not Implemented |
AM0475 # 08 Y:2004 | 08 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,490 | $900 | Implemented |
AM0475 # 07 Y:2004 | 07 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,290 | $400 | Not Implemented |
AM0475 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,020 | $33 | Implemented |
AM0475 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,100 | $300 | Implemented |
AM0475 # 04 Y:2004 | 04 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,170 | $4,600 | Not Implemented |
AM0475 # 03 Y:2004 | 03 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,390 | $500 | Implemented |