IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166

matching recommendations
Reset
NAICS 3253 Pesticide, Fertilizer, and Other Agricultural Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0119 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $1,150 $900 Implemented
MZ0119 # 04 Y:2013 04 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,728 $0 Not Implemented
DL0061 # 01 Y:2010 01 2010 REDUCE VENTILATION AIR $4,400 $100 Not Implemented
DL0061 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $1,660 $100 Not Implemented
DL0061 # 03 Y:2010 03 2010 DISCONNECT BALLASTS $655 $5,000 Implemented
DL0061 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,400 $5,200 Not Implemented
DL0061 # 05 Y:2010 05 2010 ADD AREA LIGHTING SWITCHES $23,365 $120 Implemented
DL0061 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $414 $440 Implemented
DL0061 # 07 Y:2010 07 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,800 $2,400 Not Implemented
DL0061 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $246 $400 Not Implemented
DL0061 # 09 Y:2010 09 2010 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $438 $1,100 Not Implemented
DL0061 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,529 $47,000 Implemented
DL0061 # 11 Y:2010 11 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,440 $13,400 Not Implemented
DL0061 # 12 Y:2010 12 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,690 $5,550 Not Implemented
DL0061 # 13 Y:2010 13 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $860 $8,000 Not Implemented
DL0061 # 14 Y:2010 14 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,396 $20,804 Implemented
UW0037 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,711 $1,060 Implemented
UW0037 # 02 Y:2010 02 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $709 $0 Implemented
UW0037 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $921 $1,842 Not Implemented
MS0351 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $104,520 $29,318 Not Implemented
MS0351 # 02 Y:2010 02 2010 REPAIR AND ELIMINATE STEAM LEAKS $80,833 $872 Implemented
MS0351 # 03 Y:2010 03 2010 PAY UTILITY BILLS ON TIME $36,706 $0 Implemented
MS0351 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,587 $322 Implemented
MS0351 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,134 $210 Not Implemented
MS0338 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,260 $40,176 Implemented