Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsNAICS | 3253 | Pesticide, Fertilizer, and Other Agricultural Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0584 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,030 | $100 | n/a |
LE0584 # 03 Y:2025 | 03 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $1,504 | $600 | n/a |
LE0584 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,377 | $2,400 | n/a |
LE0584 # 05 Y:2025 | 05 | 2025 | INSTALL BACK-UP EQUIPMENT | $148,846 | $350,000 | n/a |
LE0584 # 06 Y:2025 | 06 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,853 | $5,000 | n/a |
LE0584 # 07 Y:2025 | 07 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,000 | $31,500 | n/a |
LE0584 # 08 Y:2025 | 08 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $8,045 | $30,000 | n/a |
LE0584 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,871 | $0 | n/a |
DL0061 # 14 Y:2010 | 14 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,396 | $20,804 | Implemented |
DL0061 # 13 Y:2010 | 13 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $860 | $8,000 | Not Implemented |
DL0061 # 12 Y:2010 | 12 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,690 | $5,550 | Not Implemented |
DL0061 # 11 Y:2010 | 11 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,440 | $13,400 | Not Implemented |
DL0061 # 10 Y:2010 | 10 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,529 | $47,000 | Implemented |
DL0061 # 09 Y:2010 | 09 | 2010 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $438 | $1,100 | Not Implemented |
DL0061 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $246 | $400 | Not Implemented |
DL0061 # 07 Y:2010 | 07 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,800 | $2,400 | Not Implemented |
DL0061 # 06 Y:2010 | 06 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $414 | $440 | Implemented |
DL0061 # 05 Y:2010 | 05 | 2010 | ADD AREA LIGHTING SWITCHES | $23,365 | $120 | Implemented |
DL0061 # 04 Y:2010 | 04 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,400 | $5,200 | Not Implemented |
DL0061 # 03 Y:2010 | 03 | 2010 | DISCONNECT BALLASTS | $655 | $5,000 | Implemented |
DL0061 # 02 Y:2010 | 02 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,660 | $100 | Not Implemented |
DL0061 # 01 Y:2010 | 01 | 2010 | REDUCE VENTILATION AIR | $4,400 | $100 | Not Implemented |