IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 32532 Pesticide and Other Agricultural Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0317 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,793 $4,598 Implemented
MS0317 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,952 $236 Implemented
LM0095 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $93,378 $1,200 Implemented
LM0095 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,900 $2,262 Implemented
LM0095 # 11 Y:2005 11 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $46,875 $50,000 Implemented
LM0095 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,871 $750 Implemented
LM0095 # 10 Y:2005 10 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $23,750 $1,000 Implemented
LM0095 # 09 Y:2005 09 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $115,000 $3,000 Implemented
LM0095 # 08 Y:2005 08 2005 MODIFY STARTUP/SHUTDOWN TIMES $101,277 $1,000 Implemented
LM0095 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $749 $100 Implemented
SU0201 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,721 $0 Implemented
SU0201 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,182 $3,211 Implemented
SU0201 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $673 $461 Implemented
SU0201 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,555 $617 Implemented
UF0348 # 01 Y:2004 01 2004 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $1,333,121 $2,700,000 Implemented
UF0348 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,420 $29,400 Implemented
UF0348 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $7,249 $0 Implemented
UF0348 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,169 $10,500 Implemented
UF0348 # 06 Y:2004 06 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $39,206 $74,000 Implemented
UF0348 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,203 $6,441 Implemented
UF0348 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,977 $456 Implemented
UF0348 # 10 Y:2004 10 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,760 $0 Implemented