IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
NAICS 32532 Pesticide and Other Agricultural Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2107 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,971 $5,165 Implemented
LS2107 # 03 Y:2021 03 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $981 $250 Implemented
LS2107 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,148 $450 Implemented
LS2107 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $425 $25 Implemented
AS0472 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,102 $53,286 Not Implemented
AS0472 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $20,091 $41,520 Not Implemented
AS0472 # 04 Y:2019 04 2019 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $4,878 $6,000 Not Implemented
AS0472 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $95,737 $8,636 Not Implemented
AS0472 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,692 $770 Implemented
DL0061 # 01 Y:2010 01 2010 REDUCE VENTILATION AIR $4,400 $100 Not Implemented
DL0061 # 14 Y:2010 14 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,396 $20,804 Implemented
DL0061 # 13 Y:2010 13 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $860 $8,000 Not Implemented
DL0061 # 12 Y:2010 12 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,690 $5,550 Not Implemented
DL0061 # 11 Y:2010 11 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,440 $13,400 Not Implemented
DL0061 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,529 $47,000 Implemented
DL0061 # 09 Y:2010 09 2010 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $438 $1,100 Not Implemented
DL0061 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $246 $400 Not Implemented
DL0061 # 07 Y:2010 07 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,800 $2,400 Not Implemented
DL0061 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $414 $440 Implemented
DL0061 # 05 Y:2010 05 2010 ADD AREA LIGHTING SWITCHES $23,365 $120 Implemented
DL0061 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,400 $5,200 Not Implemented
DL0061 # 03 Y:2010 03 2010 DISCONNECT BALLASTS $655 $5,000 Implemented
DL0061 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $1,660 $100 Not Implemented
MS0338 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,890 $26,454 Implemented
MS0338 # 05 Y:2009 05 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,926 $1,000 Not Implemented