Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
107
matching recommendationsNAICS | 32532 | Pesticide and Other Agricultural Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0338 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,055 | $401 | Implemented |
MS0338 # 04 Y:2009 | 04 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,526 | $1,875 | Implemented |
MS0338 # 05 Y:2009 | 05 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,926 | $1,000 | Not Implemented |
MS0317 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,793 | $4,598 | Implemented |
MS0317 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,952 | $236 | Implemented |
MS0317 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,021 | $4,749 | Not Implemented |
MS0317 # 04 Y:2007 | 04 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $711 | $3,675 | Not Implemented |
LM0095 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $93,378 | $1,200 | Implemented |
LM0095 # 02 Y:2005 | 02 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,900 | $2,262 | Implemented |
LM0095 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,871 | $750 | Implemented |
LM0095 # 04 Y:2005 | 04 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $376 | $0 | Not Implemented |
LM0095 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $1,202 | $750 | Not Implemented |
LM0095 # 06 Y:2005 | 06 | 2005 | INCREASE AMOUNT OF CONDENSATE RETURNED | $67,226 | $100,000 | Not Implemented |
LM0095 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $749 | $100 | Implemented |
LM0095 # 08 Y:2005 | 08 | 2005 | MODIFY STARTUP/SHUTDOWN TIMES | $101,277 | $1,000 | Implemented |
LM0095 # 09 Y:2005 | 09 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $115,000 | $3,000 | Implemented |
LM0095 # 10 Y:2005 | 10 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $23,750 | $1,000 | Implemented |
LM0095 # 11 Y:2005 | 11 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $46,875 | $50,000 | Implemented |
LM0095 # 12 Y:2005 | 12 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $50,000 | $50,000 | Not Implemented |
SU0201 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,721 | $0 | Implemented |
SU0201 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,094 | $142 | Not Implemented |
SU0201 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,555 | $617 | Implemented |
SU0201 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $673 | $461 | Implemented |
SU0201 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,182 | $3,211 | Implemented |
SU0201 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,591 | $20,054 | Not Implemented |