IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,026

matching recommendations
Reset
NAICS 3254 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0539 # 01 Y:2023 01 2023 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $136 $40 Implemented
LE0539 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $3,105 $1,650 Not Implemented
LE0539 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,436 $6,624 Implemented
LE0539 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $37,300 $127,125 Not Implemented
UD1038 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,646 $1,000 Implemented
UD1038 # 02 Y:2022 02 2022 REDUCE VENTILATION AIR $34,366 $30,000 Not Implemented
UD1038 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,702 $1,750 Not Implemented
UD1038 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,730 $0 Not Implemented
UD1038 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,037 $29,375 Implemented
UD1038 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,751 $0 Not Implemented
UD1038 # 05 Y:2022 05 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $26,728 $32,000 Not Implemented
MI0395 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $613 $255 Implemented
MI0395 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $811 Implemented
MI0395 # 05 Y:2021 05 2021 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $5,744 $26,640 Not Implemented
MI0395 # 04 Y:2021 04 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,816 $15,328 Not Implemented
MI0395 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,523 $1,980 Implemented
MI0395 # 02 Y:2021 02 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,790 $1,380 Implemented
MI0395 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,603 $2,100 Not Implemented
NL0061 # 01 Y:2022 01 2022 METER WASTE WATER $9,914 $580 Not Implemented
NL0061 # 02 Y:2022 02 2022 USE POWER DURING OFF-PEAK PERIODS $9,080 $70 Implemented
NL0061 # 03 Y:2022 03 2022 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,939 $70 Implemented
NL0061 # 04 Y:2022 04 2022 METER WASTE WATER $3,714 $580 Not Implemented
NL0061 # 05 Y:2022 05 2022 RECOVER AND REUSE WASTE MATERIAL $3,432 $3,500 Implemented
NL0061 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $2,500 Implemented
NL0061 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $967 $1,650 Not Implemented