IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 3254 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0696 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,870 $6,360 Not Implemented
CO0696 # 01 Y:2014 01 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $9,930 $22,200 Not Implemented
CO0696 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $310 $480 Implemented
CO0696 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,140 $500 Implemented
UD0910 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $235 $0 Implemented
UD0910 # 07 Y:2014 07 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,334 $18,902 Implemented
UD0910 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,016 $1,000 Not Implemented
UD0910 # 05 Y:2014 05 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $332,549 $400,000 Not Implemented
UD0910 # 06 Y:2014 06 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,208 $40,430 Not Implemented
UD0910 # 09 Y:2014 09 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $45,862 $9,000 Not Implemented
UD0910 # 08 Y:2014 08 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $377,548 $1,083,820 Implemented
UD0910 # 02 Y:2014 02 2014 RECOVER AND REUSE COOLING WATER $5,500 $2,000 Not Implemented
UD0910 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $10,400 $10,000 Implemented
UD0910 # 11 Y:2014 11 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $8,744 $12,000 Implemented
UD0910 # 10 Y:2014 10 2014 REUSE / RECYCLE/ SELL PAPER PRODUCTS $22,280 $0 Implemented
UD0910 # 12 Y:2014 12 2014 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $3,390 $0 Not Implemented
CO0692 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,790 $21,020 Implemented
CO0692 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $39,420 $1,250 Implemented
CO0692 # 01 Y:2014 01 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,780 $10,910 Not Implemented
MZ0149 # 06 Y:2014 06 2014 AIR CONDITION ONLY SPACE NECESSARY $46,961 $5,500 Not Implemented
MZ0149 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $18,116 $16,400 Implemented
MZ0149 # 03 Y:2014 03 2014 LOWER CEILING TO REDUCE CONDITIONED SPACE $9,091 $25,000 Not Implemented
MZ0149 # 04 Y:2014 04 2014 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,580 $25,750 Not Implemented
MZ0149 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $4,128 $6,040 Implemented
MZ0149 # 05 Y:2014 05 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $14,550 $28,000 Not Implemented