IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 32541 Pharmaceutical and Medicine Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0141 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,733 $24,016 Implemented
IC0141 # 11 Y:2008 11 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $113,748 $180,000 Not Implemented
IC0141 # 10 Y:2008 10 2008 REPAIR OR REPLACE STEAM TRAPS $19,800 $17,250 Not Implemented
IC0141 # 09 Y:2008 09 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $59,840 $25,152 Not Implemented
IC0141 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,750 $1,400 Implemented
IC0141 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,000 $11,500 Implemented
IC0141 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,794 $14,000 Implemented
IC0141 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,800 $49,250 Implemented
IC0141 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,400 $0 Not Implemented
IC0141 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $23,283 $37,500 Not Implemented
IC0141 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,325 $6,000 Not Implemented
IC0059 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,384 $3,000 Not Implemented
IC0059 # 08 Y:2003 08 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,906 $39,257 Not Implemented
IC0059 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $6,054 $12,848 Not Implemented
IC0059 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,696 $89,463 Not Implemented
IC0059 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $446 $792 Not Implemented
IC0059 # 04 Y:2003 04 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,181 $1,832 Not Implemented
IC0059 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,765 $1,840 Not Implemented
IC0059 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,075 $3,136 Not Implemented