Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Illinois, Chicago |
---|---|
Assessment Year | 2003 |
Principal Product | Respiratory and Opthalmic Prescripion Pharmaceuticals |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $100,000,000-$500,000,000 |
# of Employees | 700 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 50,000,000 Pieces |
Production Hrs. Annual | 6,120 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $522,248 | 15,598,531 | kWh | $0.03 |
Electricity Demand | $414,023 | 29,195 | kW-months/year | $14.18 |
Electricity Fees | $72,263 | - | $ | - |
Natural Gas | $207,069 | 30,857 | MMBtu | $6.71 |
TOTAL ENERGY COSTS | $1,311,628 | |||
RECOMMENDED SAVINGS* | $59,507 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,384 Cost: $3,000 |
$6,548 | 116,921 | $836 | 229 | - | - | - | - | - | - |
$6,548 116,921 kWh |
$836 229 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,075 Cost: $3,136 |
$953 | 17,012 | $122 | 33 | - | - | - | - | - | - |
$953 17,012 kWh |
$122 33 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,765 Cost: $1,840 |
$3,338 | 39,736 | $427 | 78 | - | - | - | - | - | - |
$3,338 39,736 kWh |
$427 78 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,181 Cost: $1,832 |
- | - | - | - | $2,181 | 518 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,181 518 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $446 Cost: $792 |
- | - | - | - | $446 | 106 | - | - | - | - |
- - kWh |
- - kW-months/year |
$446 106 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $22,696 Cost: $89,463 |
$16,160 | 288,582 | $2,065 | 566 | - | - | $121 | - | $4,350 | - |
$16,160 288,582 kWh |
$2,065 566 kW-months/year |
- - MMBtu |
$121 - $ |
$4,350 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $6,054 Cost: $12,848 |
$5,900 | 103,557 | $154 | 42 | - | - | - | - | - | - |
$5,900 103,557 kWh |
$154 42 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $15,906 Cost: $39,257 |
$(-1,113) | (-19,877) | $(-274) | (-75) | $16,663 | 4,437 | $630 | - | - | - |
$(-1,113) (-19,877) kWh |
$(-274) (-75) kW-months/year |
$16,663 4,437 MMBtu |
$630 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $59,507 Cost: $152,168 |
$31,786 | 545,931 | $3,330 | 873 | $19,290 | 5,061 | $751 | - | $4,350 | - | $31,786 545,931 kWh |
$3,330 873 kW-months/year |
$19,290 5,061 MMBtu |
$751 - $ |
$4,350 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |