matching recommendationsNAICS | 32541 | Pharmaceutical and Medicine Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0255 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,932 | $60,862 | n/a |
UU0255 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,033 | $8,000 | n/a |
UU0255 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,750 | $4,964 | n/a |
UU0255 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM THICKNESS INSULATION | $10,948 | $4,085 | n/a |
UU0255 # 07 Y:2024 | 07 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,849 | $4,680 | n/a |
UU0255 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,299 | $2,614 | n/a |
UU0255 # 02 Y:2024 | 02 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $5,674 | $8,711 | n/a |
UU0255 # 01 Y:2024 | 01 | 2024 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $64,548 | $8,000 | n/a |
UU0221 # 07 Y:2023 | 07 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $280 | $965 | Not Implemented |
UU0221 # 06 Y:2023 | 06 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $293 | $1,410 | Not Implemented |
UU0221 # 05 Y:2023 | 05 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,589 | $4,500 | Implemented |
UU0221 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,675 | $25,694 | Not Implemented |
UU0221 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $6,221 | $11,385 | Implemented |
UU0221 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,523 | $21,923 | Not Implemented |
UU0221 # 01 Y:2023 | 01 | 2023 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $27,210 | $12,350 | Implemented |
UU0149 # 07 Y:2019 | 07 | 2019 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $797 | $1,990 | Not Implemented |
UU0149 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $495 | $286 | Not Implemented |
UU0149 # 09 Y:2019 | 09 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $391 | $300 | Not Implemented |
UU0149 # 10 Y:2019 | 10 | 2019 | INSTALL OCCUPANCY SENSORS | $322 | $402 | Not Implemented |
UU0149 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $824 | $1,208 | Not Implemented |
UU0149 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,945 | $200 | Not Implemented |
UU0149 # 04 Y:2019 | 04 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,980 | $0 | Not Implemented |
UU0149 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,173 | $120 | Not Implemented |
UU0149 # 02 Y:2019 | 02 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,611 | $1,000 | Not Implemented |
UU0149 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,874 | $9,432 | Not Implemented |