Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsNAICS | 32541 | Pharmaceutical and Medicine Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0115 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $212 | $550 | Not Implemented |
WM0115 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,509 | $3,740 | Not Implemented |
WM0115 # 03 Y:2017 | 03 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,532 | $17,600 | Not Implemented |
WM0115 # 02 Y:2017 | 02 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,812 | $810 | Not Implemented |
WM0115 # 01 Y:2017 | 01 | 2017 | USE SYNTHETIC LUBRICANT | $11,231 | $17,756 | Not Implemented |
LE0446 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $89,899 | $25,000 | Implemented |
LE0446 # 08 Y:2017 | 08 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $940 | $1,500 | Implemented |
LE0446 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $672 | $30 | Implemented |
LE0446 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $2,033 | $30 | Implemented |
LE0446 # 01 Y:2017 | 01 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,142 | $30 | Not Implemented |
LE0446 # 10 Y:2017 | 10 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,351 | $6,525 | Implemented |
LE0446 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,120 | $29,145 | Implemented |
LE0446 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,447 | $1,000 | Not Implemented |
LE0446 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $22,087 | $5,000 | Implemented |
LE0446 # 04 Y:2017 | 04 | 2017 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $9,554 | $500 | Not Implemented |
LE0443 # 13 Y:2017 | 13 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,256 | $10,938 | Implemented |
LE0443 # 14 Y:2017 | 14 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,524 | $32,000 | Implemented |
LE0443 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,373 | $5,300 | Not Implemented |
LE0443 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,572 | $108,715 | Implemented |
LE0443 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,710 | $37,500 | Not Implemented |
LE0443 # 11 Y:2017 | 11 | 2017 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $8,886 | $32,000 | Not Implemented |
LE0443 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,458 | $8,500 | Not Implemented |
LE0443 # 08 Y:2017 | 08 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,903 | $9,500 | Not Implemented |
LE0443 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,762 | $1,000 | Implemented |
LE0443 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,930 | $8,000 | Not Implemented |