IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
NAICS 325411 Medicinal and Botanical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0149 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $495 $286 Not Implemented
UU0149 # 04 Y:2019 04 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,980 $0 Not Implemented
UU0149 # 06 Y:2019 06 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $824 $1,208 Not Implemented
UU0149 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,874 $9,432 Not Implemented
UU0149 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,611 $1,000 Not Implemented
UU0149 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,945 $200 Not Implemented
UU0149 # 10 Y:2019 10 2019 INSTALL OCCUPANCY SENSORS $322 $402 Not Implemented
UU0149 # 09 Y:2019 09 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $391 $300 Not Implemented
AS0469 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,924 $37,163 Not Implemented
AS0469 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,730 $10,305 Not Implemented
AS0469 # 03 Y:2019 03 2019 INSTALL SKYLIGHTS $4,029 $14,835 Not Implemented
AS0469 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,578 $900 Not Implemented
AS0469 # 05 Y:2019 05 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,906 $420 Not Implemented
CL1903 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,099 $450 Not Implemented
CL1903 # 03 Y:2019 03 2019 USE POWER DURING OFF-PEAK PERIODS $14,816 $1,000 Not Implemented
CL1903 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,869 $246,400 Not Implemented
WM0115 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $212 $550 Not Implemented
WM0115 # 03 Y:2017 03 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $7,532 $17,600 Not Implemented
WM0115 # 02 Y:2017 02 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,812 $810 Not Implemented
WM0115 # 01 Y:2017 01 2017 USE SYNTHETIC LUBRICANT $11,231 $17,756 Not Implemented
WM0115 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $3,740 Not Implemented
OR0691 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $955 $1,955 Implemented
OR0691 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $772 $4,048 Not Implemented
OR0691 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,762 $1,200 Implemented
OR0691 # 01 Y:2017 01 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,769 $39,442 Not Implemented