Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsNAICS | 325411 | Medicinal and Botanical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0221 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,523 | $21,923 | Not Implemented |
UU0221 # 06 Y:2023 | 06 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $293 | $1,410 | Not Implemented |
UU0221 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,675 | $25,694 | Not Implemented |
BS0138 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,016 | $73,500 | Not Implemented |
BS0138 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $1,344 | $270 | Not Implemented |
BS0138 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $11,555 | $51,920 | Not Implemented |
MI0364 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,252 | $23,997 | Implemented |
MI0364 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $38,687 | $109,552 | Implemented |
MI0364 # 02 Y:2019 | 02 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,750 | $35,446 | Implemented |
MI0364 # 05 Y:2019 | 05 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $5,164 | $16,940 | Implemented |
MI0364 # 07 Y:2019 | 07 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,899 | $3,316 | Not Implemented |
MI0364 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,631 | $3,600 | Implemented |
MI0364 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,784 | $7,500 | Not Implemented |
UU0149 # 02 Y:2019 | 02 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,611 | $1,000 | Not Implemented |
UU0149 # 10 Y:2019 | 10 | 2019 | INSTALL OCCUPANCY SENSORS | $322 | $402 | Not Implemented |
UU0149 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $495 | $286 | Not Implemented |
UU0149 # 04 Y:2019 | 04 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,980 | $0 | Not Implemented |
UU0149 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,945 | $200 | Not Implemented |
UU0149 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,173 | $120 | Not Implemented |
UU0149 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $824 | $1,208 | Not Implemented |
UU0149 # 09 Y:2019 | 09 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $391 | $300 | Not Implemented |
UU0149 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,874 | $9,432 | Not Implemented |
UU0149 # 07 Y:2019 | 07 | 2019 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $797 | $1,990 | Not Implemented |
AS0469 # 05 Y:2019 | 05 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,906 | $420 | Not Implemented |
AS0469 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,578 | $900 | Not Implemented |