IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

683

matching recommendations
Reset
NAICS 3255 Paint, Coating, and Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0851 # 14 Y:2012 14 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,300 $1,000 Not Implemented
UD0851 # 15 Y:2012 15 2012 REDUCE VENTILATION AIR $10,721 $32,160 Not Implemented
MA0688 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $22,622 $21,500 Not Implemented
MA0688 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $10,004 $9,352 Implemented
MA0688 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,644 $2,250 Implemented
MA0688 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,988 $1,800 Not Implemented
MA0688 # 05 Y:2012 05 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,762 $15,050 Not Implemented
MA0688 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $1,689 $4,605 Implemented
MAS015 # 01 Y:2012 01 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,716 $4,442 Not Implemented
MAS015 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,906 $9,000 Not Implemented
MAS015 # 03 Y:2012 03 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,535 $3,900 Not Implemented
SD0437 # 01 Y:2011 01 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,036 $0 Not Implemented
SD0437 # 02 Y:2011 02 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,730 $2,850 Implemented
SD0437 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $3,552 $214 Not Implemented
SD0437 # 04 Y:2011 04 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,194 $610 Not Implemented
SD0437 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,326 $700 Implemented
SD0437 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,396 $2,000 Implemented
OK0809 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,884 $59,335 Not Implemented
OK0809 # 02 Y:2011 02 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,809 $46,235 Implemented
OK0809 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,138 $2,588 Implemented
OK0809 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $3,472 $1,238 Implemented
OK0809 # 05 Y:2011 05 2011 DISCONNECT BALLASTS $20,420 $3,787 Implemented
OK0809 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,485 $6,134 Implemented
OK0809 # 07 Y:2011 07 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,975 $17,104 Not Implemented
OK0809 # 08 Y:2011 08 2011 REPAIR AND ELIMINATE STEAM LEAKS $26,809 $375 Implemented