IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

651

matching recommendations
Reset
NAICS 3255 Paint, Coating, and Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1027 # 10 Y:2021 10 2021 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $10,735 $43,000 Not Implemented
UD1027 # 02 Y:2021 02 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,486 $1,000 Not Implemented
MA0820 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $30,760 $129,192 Not Implemented
MA0820 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,862 $11,220 Not Implemented
MA0820 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,673 $7,900 Not Implemented
MA0820 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $723 $300 Implemented
MA0820 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $204 $200 Implemented
IP0135 # 12 Y:2020 12 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,916 $6,013 Implemented
IP0135 # 01 Y:2020 01 2020 COMBINE UTILITY METERS $2,157 $0 Implemented
IP0135 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $578 $0 Not Implemented
IP0135 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $317 $0 Implemented
IP0135 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,925 $401 Not Implemented
IP0135 # 05 Y:2020 05 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,568 $390 Implemented
IP0135 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,626 $1,418 Implemented
IP0135 # 07 Y:2020 07 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $957 $588 Implemented
IP0135 # 08 Y:2020 08 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,191 $8,000 Not Implemented
IP0135 # 09 Y:2020 09 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,937 $3,800 Implemented
IP0135 # 10 Y:2020 10 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $180 $375 Not Implemented
IP0135 # 11 Y:2020 11 2020 INSTALL OCCUPANCY SENSORS $94 $210 Not Implemented
MI0369 # 02 Y:2020 02 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $6,954 $7,492 Implemented
MI0369 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,259 $580 Implemented
MI0369 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,267 $1,980 Implemented
MI0369 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,265 $7,389 Not Implemented
MI0369 # 05 Y:2020 05 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $551 $280 Not Implemented
MI0369 # 06 Y:2020 06 2020 PAY BILLS ON TIME TO AVOID LATE FEES $438 $0 Not Implemented