IAC Assessment: WV0678
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0678
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2025
Principal Product Sealants, Adhesives, Mortars, Admixtures
NAICS 325520 - Adhesive Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $50,000,000-$100,000,000
# of Employees 168
Plant Area (Sq.Ft.) 130,000
Annual Production 66,138 Tons
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $541,722 8,064,180 kWh $0.07
Electricity Demand $111,245 14,832 kW-months/year $7.50
Electricity Fees $4,603 - $ -
Natural Gas $195,477 34,747 MMBtu $5.63
TOTAL ENERGY COSTS $853,047
RECOMMENDED SAVINGS* $131,603 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes By-product Production Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 3.4151 MINIMIZE WATER USAGE Savings:
$16,085
Cost:
$31,231
$(-702) (-10,444) $(-113) (-15) - - $17,594 1,954 $(-694) - - - $(-702)
(-10,444)
kWh
$(-113)
(-15)
kW-months/year
-
-
MMBtu
$17,594
1,954
Tgal
$(-694)
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$22,738
Cost:
$38,304
$19,490 290,036 $3,248 433 - - - - - - - - $19,490
290,036
kWh
$3,248
433
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$20,707
Cost:
$41,750
$17,962 267,292 $2,745 366 - - - - - - - - $17,962
267,292
kWh
$2,745
366
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$12,735
Cost:
$5,200
$15,499 230,643 $2,844 379 - - - - $(-5,608) - - - $15,499
230,643
kWh
$2,844
379
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-5,608)
-
$
-
-
$
05: 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) Savings:
$11,667
Cost:
$55,000
$(-2,216) (-32,981) - - $3,592 638 $9,331 1,037 - - $960 - $(-2,216)
(-32,981)
kWh
-
-
kW-months/year
$3,592
638
MMBtu
$9,331
1,037
Tgal
-
-
$
$960
-
$
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$5,185
Cost:
$11,425
- - - - $5,185 921 - - - - - - -
-
kWh
-
-
kW-months/year
$5,185
921
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,003
Cost:
$3,121
- - - - $7,003 1,244 - - - - - - -
-
kWh
-
-
kW-months/year
$7,003
1,244
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,842
Cost:
$11,112
$3,162 47,056 $1,680 224 - - - - - - - - $3,162
47,056
kWh
$1,680
224
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,772
Cost:
$4,323
$3,909 58,164 $863 115 - - - - - - - - $3,909
58,164
kWh
$863
115
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
10: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$4,453
Cost:
$20,950
- - - - $4,453 791 - - - - - - -
-
kWh
-
-
kW-months/year
$4,453
791
MMBtu
-
-
Tgal
-
-
$
-
-
$
11: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$4,279
Cost:
$18,380
- - - - $4,279 760 - - - - - - -
-
kWh
-
-
kW-months/year
$4,279
760
MMBtu
-
-
Tgal
-
-
$
-
-
$
12: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,059
Cost:
$1,304
$3,487 51,895 $640 85 - - - - $(-68) - - - $3,487
51,895
kWh
$640
85
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-68)
-
$
-
-
$
13: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$3,130
Cost:
$2,676
- - - - $3,130 566 - - - - - - -
-
kWh
-
-
kW-months/year
$3,130
566
MMBtu
-
-
Tgal
-
-
$
-
-
$
14: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,031
Cost:
$684
$2,611 38,852 $420 56 - - - - - - - - $2,611
38,852
kWh
$420
56
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,433
Cost:
$11,061
$1,902 28,289 $531 70 - - - - - - - - $1,902
28,289
kWh
$531
70
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
16: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,980
Cost:
$304
$1,710 25,450 $270 36 - - - - - - - - $1,710
25,450
kWh
$270
36
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
17: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,209
Cost:
$3,002
$1,044 15,529 $165 22 - - - - - - - - $1,044
15,529
kWh
$165
22
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
18: 2.2511 INSULATE BARE EQUIPMENT Savings:
$664
Cost:
$914
- - - - $664 118 - - - - - - -
-
kWh
-
-
kW-months/year
$664
118
MMBtu
-
-
Tgal
-
-
$
-
-
$
19: 2.7314 REDUCE VENTILATION AIR Savings:
$631
Cost:
$2,400
- - - - $631 112 - - - - - - -
-
kWh
-
-
kW-months/year
$631
112
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$131,603
Cost:
$263,141
$67,858 1,009,781 $13,293 1,771 $28,937 5,150 $26,925 2,991 $(-6,370) - $960 - $67,858
1,009,781
kWh
$13,293
1,771
kW-months/year
$28,937
5,150
MMBtu
$26,925
2,991
Tgal
$(-6,370)
-
$
$960
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes By-product Production Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes By-product Production