Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
39
matching recommendationsNAICS | 3255 | Paint, Coating, and Adhesive Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0369 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,265 | $7,389 | Not Implemented |
MI0369 # 02 Y:2020 | 02 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $6,954 | $7,492 | Implemented |
MI0369 # 06 Y:2020 | 06 | 2020 | PAY BILLS ON TIME TO AVOID LATE FEES | $438 | $0 | Not Implemented |
MI0369 # 05 Y:2020 | 05 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $551 | $280 | Not Implemented |
MI0369 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,267 | $1,980 | Implemented |
MI0369 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,259 | $580 | Implemented |
MI0334 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,564 | $3,102 | Implemented |
MI0334 # 11 Y:2018 | 11 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $592 | $1,973 | Implemented |
MI0334 # 10 Y:2018 | 10 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $803 | $1,560 | Implemented |
MI0334 # 09 Y:2018 | 09 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $816 | $1,980 | Not Implemented |
MI0334 # 08 Y:2018 | 08 | 2018 | REDUCE DELIVERY SCHEDULES | $1,454 | $2,490 | Implemented |
MI0334 # 06 Y:2018 | 06 | 2018 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,637 | $3,750 | Not Implemented |
MI0334 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,877 | $1,300 | Implemented |
MI0334 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,175 | $6,578 | Not Implemented |
MI0334 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,178 | $2,030 | Implemented |
MI0334 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,575 | $13,838 | Implemented |
MI0334 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,234 | $12,519 | Not Implemented |
MI0244 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,192 | $1,660 | Implemented |
MI0244 # 09 Y:2013 | 09 | 2013 | INSTALL OCCUPANCY SENSORS | $2,117 | $446 | Implemented |
MI0244 # 07 Y:2013 | 07 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,411 | $80 | Implemented |
MI0244 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,120 | $3,520 | Not Implemented |
MI0244 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,214 | $80 | Implemented |
MI0244 # 04 Y:2013 | 04 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,133 | $2,600 | Not Implemented |
MI0244 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,762 | $68,060 | Not Implemented |
MI0244 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,361 | $1,800 | Implemented |