Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
399
matching recommendationsNAICS | 32551 | Paint and Coating Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0898 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $621 | $20 | Implemented |
UD0898 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $309 | $0 | Implemented |
SD0477 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,922 | $17,910 | Not Implemented |
SD0477 # 02 Y:2013 | 02 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,803 | $9,900 | Not Implemented |
SD0477 # 03 Y:2013 | 03 | 2013 | INSULATE BARE EQUIPMENT | $2,635 | $4,905 | Not Implemented |
SD0477 # 04 Y:2013 | 04 | 2013 | USE PHOTOCELL CONTROLS | $2,407 | $4,140 | Not Implemented |
SD0477 # 05 Y:2013 | 05 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,263 | $200 | Implemented |
SD0477 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,737 | $5,300 | Not Implemented |
SD0477 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $646 | $300 | Not Implemented |
SU0353 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $839 | $0 | Implemented |
SU0353 # 02 Y:2013 | 02 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,044 | $1,188 | Not Implemented |
SU0353 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $896 | $273 | Implemented |
SU0353 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $424 | $345 | Implemented |
SU0353 # 05 Y:2013 | 05 | 2013 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,685 | $3,075 | Implemented |
SU0353 # 06 Y:2013 | 06 | 2013 | REPLACE BOILER | $34,391 | $40,935 | Implemented |
SU0353 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $627 | $737 | Implemented |
SU0353 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18 | $29 | Implemented |
UD0886 # 01 Y:2013 | 01 | 2013 | MINIMIZE WATER USAGE | $32,244 | $1,000 | Not Implemented |
UD0886 # 02 Y:2013 | 02 | 2013 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,317 | $1,000 | Not Implemented |
UD0886 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,238 | $7,500 | Not Implemented |
UD0886 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,782 | $50,000 | Not Implemented |
UD0886 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,028 | $0 | Not Implemented |
UD0886 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,761 | $0 | Not Implemented |
UD0886 # 07 Y:2013 | 07 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $36,728 | $14,900 | Implemented |
UD0886 # 08 Y:2013 | 08 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $4,035 | $3,550 | Not Implemented |