Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
120
matching recommendationsNAICS | 32552 | Adhesive Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0678 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,185 | $11,425 | n/a |
WV0678 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,707 | $41,750 | n/a |
WV0678 # 19 Y:2025 | 19 | 2025 | REDUCE VENTILATION AIR | $631 | $2,400 | n/a |
WV0678 # 05 Y:2025 | 05 | 2025 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $11,667 | $55,000 | n/a |
WV0678 # 16 Y:2025 | 16 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,980 | $304 | n/a |
WV0678 # 14 Y:2025 | 14 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,031 | $684 | n/a |
WV0678 # 01 Y:2025 | 01 | 2025 | MINIMIZE WATER USAGE | $16,085 | $31,231 | n/a |
WV0678 # 04 Y:2025 | 04 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,735 | $5,200 | n/a |
WV0678 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $22,738 | $38,304 | n/a |
WV0678 # 15 Y:2025 | 15 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,433 | $11,061 | n/a |
WV0678 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $4,772 | $4,323 | n/a |
WV0678 # 12 Y:2025 | 12 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $4,059 | $1,304 | n/a |
WV0678 # 17 Y:2025 | 17 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,209 | $3,002 | n/a |
WV0678 # 10 Y:2025 | 10 | 2025 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,453 | $20,950 | n/a |
WV0678 # 18 Y:2025 | 18 | 2025 | INSULATE BARE EQUIPMENT | $664 | $914 | n/a |
WV0678 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,842 | $11,112 | n/a |
WV0678 # 07 Y:2025 | 07 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,003 | $3,121 | n/a |
WV0678 # 11 Y:2025 | 11 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,279 | $18,380 | n/a |
WV0678 # 13 Y:2025 | 13 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,130 | $2,676 | n/a |
UL2416 # 03 Y:2024 | 03 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $276 | $0 | n/a |
UL2416 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $20,797 | $16,250 | n/a |
UL2416 # 13 Y:2024 | 13 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $19,610 | $190,384 | n/a |
UL2416 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $565 | $273 | n/a |
UL2416 # 09 Y:2024 | 09 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,542 | $1,170 | n/a |
UL2416 # 12 Y:2024 | 12 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,386 | $1,600 | n/a |