Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
357
matching recommendationsNAICS | 32561 | Soap and Cleaning Compound Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0279 # 11 Y:2023 | 11 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $10,359 | $750 | Implemented |
IC0279 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $2,613 | $254 | Implemented |
IC0279 # 03 Y:2023 | 03 | 2023 | ELIMINATE COMBUSTIBLE GAS IN FLUE GAS | $205,098 | $12,050 | Not Implemented |
IC0279 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $538 | $1,455 | Implemented |
OK1060 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $471 | $0 | Implemented |
OK1060 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $445 | $1,989 | Not Implemented |
OK1060 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,541 | $11,594 | Not Implemented |
OK1060 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $352 | $1,500 | Not Implemented |
OK1060 # 04 Y:2022 | 04 | 2022 | INSTALL SUB-METERING EQUIPMENT | $2,400 | $992 | Not Implemented |
IP0149 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,671 | $95 | Implemented |
IP0149 # 08 Y:2021 | 08 | 2021 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $8,424 | $30,935 | Not Implemented |
IP0149 # 07 Y:2021 | 07 | 2021 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,813 | $8,000 | Not Implemented |
IP0149 # 06 Y:2021 | 06 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,621 | $2,279 | Not Implemented |
IP0149 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $330 | $450 | Implemented |
IP0149 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $416 | $380 | Implemented |
IP0149 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,309 | $8,100 | Not Implemented |
IP0149 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $982 | $120 | Implemented |
SD0611 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,424 | $1,815 | Not Implemented |
SD0611 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $203 | $387 | Implemented |
SD0611 # 06 Y:2021 | 06 | 2021 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $45,722 | $186,400 | Implemented |
SD0611 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $30,193 | $22,050 | Implemented |
SD0611 # 02 Y:2021 | 02 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,709 | $10,350 | Not Implemented |
SD0611 # 07 Y:2021 | 07 | 2021 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,308 | $6,000 | Implemented |
SD0611 # 03 Y:2021 | 03 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,824 | $24,300 | Not Implemented |
LE0505 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,327 | $20,855 | Implemented |