Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
223
matching recommendationsNAICS | 325611 | Soap and Other Detergent Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0690 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,095 | $308 | n/a |
WV0690 # 08 Y:2025 | 08 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $1,772 | $8,336 | n/a |
WV0690 # 09 Y:2025 | 09 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,747 | $8,115 | n/a |
WV0690 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $1,342 | $3,197 | n/a |
WV0690 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,537 | $11,140 | n/a |
WV0690 # 06 Y:2025 | 06 | 2025 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,997 | $12,500 | n/a |
WV0690 # 07 Y:2025 | 07 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,735 | $1,187 | n/a |
WV0690 # 12 Y:2025 | 12 | 2025 | INSULATE BARE EQUIPMENT | $224 | $391 | n/a |
WV0690 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,161 | $28,584 | n/a |
WV0690 # 11 Y:2025 | 11 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $648 | $782 | n/a |
WV0690 # 01 Y:2025 | 01 | 2025 | REDUCE VENTILATION AIR | $61,627 | $6,564 | n/a |
WV0690 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $6,659 | $13,993 | n/a |
IC0279 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $58,649 | $36,118 | Not Implemented |
IC0279 # 10 Y:2023 | 10 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $610,617 | $3,463,096 | Not Implemented |
IC0279 # 11 Y:2023 | 11 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $10,359 | $750 | Implemented |
IC0279 # 04 Y:2023 | 04 | 2023 | INCREASE AMOUNT OF CONDENSATE RETURNED | $89,401 | $210,300 | Not Implemented |
IC0279 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $26,751 | $41,956 | Not Implemented |
IC0279 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $538 | $1,455 | Implemented |
IC0279 # 07 Y:2023 | 07 | 2023 | OPERATE BOILERS ON HIGH FIRE SETTING | $3,858 | $72 | Not Implemented |
IC0279 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $159,499 | $2,716,228 | Not Implemented |
IC0279 # 03 Y:2023 | 03 | 2023 | ELIMINATE COMBUSTIBLE GAS IN FLUE GAS | $205,098 | $12,050 | Not Implemented |
IC0279 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,146 | $4,937 | Implemented |
IC0279 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $2,613 | $254 | Implemented |
OK1060 # 04 Y:2022 | 04 | 2022 | INSTALL SUB-METERING EQUIPMENT | $2,400 | $992 | Not Implemented |
OK1060 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $471 | $0 | Implemented |