Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsNAICS | 325612 | Polish and Other Sanitation Good Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2414 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $58,575 | $420,000 | n/a |
LS2414 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,889 | $1,050 | n/a |
LS2414 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $810,158 | $2,364,120 | n/a |
LS2414 # 02 Y:2024 | 02 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $265,645 | $63,000 | n/a |
LS2414 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $2,180 | $250 | n/a |
IP0193 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $513 | $972 | n/a |
IP0193 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,354 | $0 | n/a |
IP0193 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,007 | $104 | n/a |
IP0193 # 03 Y:2024 | 03 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,590 | $0 | n/a |
IP0193 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,687 | $10,184 | n/a |
IP0193 # 05 Y:2024 | 05 | 2024 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $2,202 | $1,165 | n/a |
IP0192 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,354 | $35 | n/a |
IP0192 # 02 Y:2024 | 02 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $546 | $0 | n/a |
IP0192 # 03 Y:2024 | 03 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,767 | $448 | n/a |
IP0192 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,831 | $1,865 | n/a |
IP0192 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,967 | $1,205 | n/a |
IP0192 # 06 Y:2024 | 06 | 2024 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $1,077 | $1,105 | n/a |
IP0192 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,546 | $2,248 | n/a |
OK1046 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $827 | $0 | Implemented |
OK1046 # 04 Y:2021 | 04 | 2021 | OPTIMIZE PLANT POWER FACTOR | $2,125 | $8,240 | Not Implemented |
OK1046 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,027 | $38,688 | Implemented |
OK1046 # 01 Y:2021 | 01 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,296 | $2,422 | Not Implemented |
OK1046 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $569 | $512 | Not Implemented |
MI0344 # 06 Y:2018 | 06 | 2018 | USE PHOTOCELL CONTROLS | $3,042 | $2,219 | Implemented |
MI0344 # 01 Y:2018 | 01 | 2018 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $55,478 | $62,800 | Not Implemented |