Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsNAICS | 325612 | Polish and Other Sanitation Good Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2414 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $58,575 | $420,000 | Not Implemented |
LS2414 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,889 | $1,050 | Not Implemented |
LS2414 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $810,158 | $2,364,120 | Implemented |
LS2414 # 02 Y:2024 | 02 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $265,645 | $63,000 | Implemented |
LS2414 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $2,180 | $250 | Not Implemented |
IP0193 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $513 | $972 | Not Implemented |
IP0193 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,354 | $0 | Not Implemented |
IP0193 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,007 | $104 | Not Implemented |
IP0193 # 03 Y:2024 | 03 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,590 | $0 | Not Implemented |
IP0193 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,687 | $10,184 | Not Implemented |
IP0193 # 05 Y:2024 | 05 | 2024 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $2,202 | $1,165 | Not Implemented |
IP0192 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,354 | $35 | Not Implemented |
IP0192 # 02 Y:2024 | 02 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $546 | $0 | Not Implemented |
IP0192 # 03 Y:2024 | 03 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,767 | $448 | Not Implemented |
IP0192 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,831 | $1,865 | Not Implemented |
IP0192 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,967 | $1,205 | Not Implemented |
IP0192 # 06 Y:2024 | 06 | 2024 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $1,077 | $1,105 | Not Implemented |
IP0192 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,546 | $2,248 | Not Implemented |
OK1046 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $827 | $0 | Implemented |
OK1046 # 04 Y:2021 | 04 | 2021 | OPTIMIZE PLANT POWER FACTOR | $2,125 | $8,240 | Not Implemented |
OK1046 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,027 | $38,688 | Implemented |
OK1046 # 01 Y:2021 | 01 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,296 | $2,422 | Not Implemented |
OK1046 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $569 | $512 | Not Implemented |
MI0344 # 06 Y:2018 | 06 | 2018 | USE PHOTOCELL CONTROLS | $3,042 | $2,219 | Implemented |
MI0344 # 01 Y:2018 | 01 | 2018 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $55,478 | $62,800 | Not Implemented |