IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 32562 Toilet Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0475 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,094 $5,938 Implemented
AS0475 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,779 $895 Implemented
AS0475 # 04 Y:2019 04 2019 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $2,515 $7,906 Not Implemented
AS0475 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,084 $1,166 Not Implemented
AS0475 # 06 Y:2019 06 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $411 $236 Not Implemented
AS0475 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $159 $752 Implemented
AS0475 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $23 Not Implemented
AS0475 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,577 $20,083 Not Implemented
IP0113 # 13 Y:2019 13 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,555 $21,000 Not Implemented
IP0113 # 12 Y:2019 12 2019 RECOVER WASTE HEAT FROM EQUIPMENT $892 $2,129 Not Implemented
IP0113 # 11 Y:2019 11 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $476 $1,343 Implemented
IP0113 # 10 Y:2019 10 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $775 $765 Not Implemented
IP0113 # 09 Y:2019 09 2019 OPTIMIZE PLANT POWER FACTOR $1,564 $876 Not Implemented
IP0113 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $591 $501 Implemented
IP0113 # 07 Y:2019 07 2019 USE PHOTOCELL CONTROLS $151 $71 Implemented
IP0113 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,196 $72 Implemented
IP0113 # 05 Y:2019 05 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $629 $0 Not Implemented
IP0113 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $783 $0 Not Implemented
IP0113 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,595 $4 Not Implemented
IP0113 # 02 Y:2019 02 2019 COMBINE UTILITY METERS $1,625 $0 Not Implemented
IP0113 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,753 $0 Not Implemented