IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

225

matching recommendations
Reset
NAICS 325620 Toilet Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0241 # 01 Y:2024 01 2024 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $8,700 $12,200 Not Implemented
UU0241 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $650 $2,200 Not Implemented
UU0241 # 05 Y:2024 05 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,300 $7,800 Not Implemented
UU0241 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $589 $750 Implemented
UU0241 # 04 Y:2024 04 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,480 $6,000 Implemented
UU0241 # 06 Y:2024 06 2024 INSULATE BARE EQUIPMENT $1,150 $3,710 Not Implemented
UU0241 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,030 $17,040 Not Implemented
UU0241 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $7,740 $10,080 Implemented
UL2316 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,026 $0 n/a
UL2316 # 02 Y:2023 02 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $73,247 $137,300 n/a
UL2316 # 05 Y:2023 05 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,036 $20,000 n/a
UL2316 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,992 $0 n/a
UL2316 # 06 Y:2023 06 2023 INSTALL HYDROGEN FUEL CELL $281,388 $1,750,000 n/a
UL2316 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $112,167 $989,084 n/a
MI0435 # 03 Y:2023 03 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,206 $26,962 n/a
MI0435 # 08 Y:2023 08 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $4,360 $3,208 n/a
MI0435 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,399 $1,690 n/a
MI0435 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,484 $21,636 n/a
MI0435 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $28,034 $780 n/a
MI0435 # 10 Y:2023 10 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,011 $0 n/a
MI0435 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,992 $13,440 n/a
MI0435 # 11 Y:2023 11 2023 AIR CONDITION ONLY SPACE NECESSARY $762 $770 n/a
MI0435 # 07 Y:2023 07 2023 REDUCE VENTILATION AIR $4,793 $5,900 n/a
MI0435 # 12 Y:2023 12 2023 INSTALL OCCUPANCY SENSORS $297 $96 n/a
MI0435 # 09 Y:2023 09 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,258 $1,532 n/a