IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
NAICS 325620 Toilet Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0598 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,906 $25,280 Not Implemented
UF0598 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,433 $14,328 Implemented
UF0598 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,556 $22,000 Implemented
UF0598 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,338 $432 Implemented
UF0598 # 08 Y:2023 08 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $8,114 $0 Implemented
UF0598 # 09 Y:2023 09 2023 INSTALL TURBULATORS $6,732 $7,500 Implemented
UF0598 # 10 Y:2023 10 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,588 $2,800 Implemented
MI0397 # 05 Y:2021 05 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,631 $40 Implemented
MI0397 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $4,555 Not Implemented
MI0397 # 03 Y:2021 03 2021 METER WASTE WATER $2,172 $1,380 Not Implemented
MI0397 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,361 $40 Implemented
MI0397 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,589 $480 Not Implemented
MI0397 # 02 Y:2021 02 2021 AIR CONDITION ONLY SPACE NECESSARY $2,751 $480 Not Implemented
MI0234 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,035 $2,600 Implemented
MI0234 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,388 $80 Implemented
MI0234 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,377 $1,660 Implemented
MI0234 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,115 $8,409 Implemented
MI0234 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,067 $2,520 Implemented
MI0234 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,103 $80 Implemented
MI0234 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $311 $600 Not Implemented
MI0234 # 08 Y:2013 08 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $252 $447 Implemented
MI0234 # 09 Y:2013 09 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $159 $380 Not Implemented
UF0370 # 12 Y:2005 12 2005 IMPROVE SPACE COMFORT CONDITIONING $3,223 $12,400 Not Implemented
UF0370 # 11 Y:2005 11 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,313 $0 Implemented
UF0370 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $313 $760 Not Implemented