IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

923

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1064 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,680 $0 Not Implemented
UD1064 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $754 $0 Not Implemented
UD1064 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,422 $13,970 Not Implemented
UD1064 # 04 Y:2023 04 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $914 $4,215 Not Implemented
UD1064 # 05 Y:2023 05 2023 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,632 $0 Not Implemented
UD1064 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,630 $32,000 Not Implemented
UC2307 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,379 $0 Not Implemented
UC2307 # 02 Y:2023 02 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $4,994 $0 Not Implemented
UC2307 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $352 $0 Not Implemented
UC2307 # 04 Y:2023 04 2023 REPLACE BOILER $6,269 $41,061 Not Implemented
UC2307 # 05 Y:2023 05 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $508 $529 Not Implemented
UC2307 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $411 $3,486 Not Implemented
UC2307 # 07 Y:2023 07 2023 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,643 $34,992 Not Implemented
UC2307 # 08 Y:2023 08 2023 METER WASTE WATER $383 $455 Not Implemented
UC2307 # 09 Y:2023 09 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,108 $31,637 Not Implemented
UC2307 # 10 Y:2023 10 2023 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,667 $13,200 Not Implemented
UL2301 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,408 $2,832 Implemented
UL2301 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $5,141 $9,184 Not Implemented
UL2301 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $33,531 $260,163 Not Implemented
UL2301 # 04 Y:2023 04 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,944 $0 Not Implemented
UL2301 # 05 Y:2023 05 2023 ADOPT IN-HOUSE MATERIAL GENERATION $85,200 $50,198 Not Implemented
UD1056 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,474 $250 Implemented
UD1056 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,573 $0 Implemented
UD1056 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,193 $0 Implemented
UD1056 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,442 $0 Implemented