IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

868

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0289 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,719 $1,609 Not Implemented
TT0289 # 06 Y:2023 06 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $61,137 $119,000 Implemented
LT8366 # 01 Y:2023 01 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,618 $11,719 n/a
LT8366 # 02 Y:2023 02 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,157 $4,313 n/a
LT8366 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $18,863 $61,076 n/a
CW0125 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,655 $2,019 n/a
CW0125 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,007 $17,900 n/a
CW0125 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $37,427 $1,156 n/a
CW0125 # 04 Y:2022 04 2022 USE SYNTHETIC LUBRICANT $18,816 $9,059 n/a
CW0125 # 05 Y:2022 05 2022 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $23,398 $56,000 n/a
CW0125 # 06 Y:2022 06 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $70,112 $8,000 n/a
CW0125 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,449 $25,995 n/a
CW0125 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $63,307 $41,871 n/a
CC0002 # 01 Y:2022 01 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,068 $3,800 n/a
CC0002 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,965 $2,800 n/a
CC0002 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $954 $0 n/a
CC0002 # 04 Y:2022 04 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $106 $180 n/a
MI0404 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $28,220 $580 Implemented
MI0404 # 02 Y:2022 02 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,764 $479 Not Implemented
MI0404 # 03 Y:2022 03 2022 METER WASTE WATER $8,108 $1,533 Implemented
MI0404 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,549 $1,660 Not Implemented
MI0404 # 05 Y:2022 05 2022 REDUCE EXCESSIVE BOILER BLOWDOWN $1,720 $2,088 Not Implemented
MI0404 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,392 $2,520 Not Implemented
AM0832 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $234,880 $15,000 Implemented
AM0832 # 02 Y:2022 02 2022 PAY UTILITY BILLS ON TIME $725 $0 Implemented