Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
65
matching recommendationsNAICS | 3259 | Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0203 # 02 Y:2024 | 02 | 2024 | INSTALL AUTOMATIC STACK DAMPER | $55,966 | $1,300 | n/a |
IP0203 # 01 Y:2024 | 01 | 2024 | USE AUTOMATIC FLOW CONTROL | $56,666 | $700 | n/a |
IP0203 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,564 | $44 | n/a |
IP0203 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,015 | $1,072 | n/a |
IP0203 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,835 | $1,480 | n/a |
IP0203 # 05 Y:2024 | 05 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $64,223 | $20,000 | n/a |
IC0297 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,704 | $1,123 | Not Implemented |
IC0297 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,754 | $36,000 | Implemented |
IC0297 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $26,122 | $13,370 | Implemented |
IC0297 # 14 Y:2024 | 14 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $119 | $0 | Implemented |
IC0297 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $289,074 | $1,202,972 | Not Implemented |
IC0297 # 05 Y:2024 | 05 | 2024 | USE OPTIMUM THICKNESS INSULATION | $2,433 | $1,693 | Implemented |
IC0297 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $5,801 | $2,620 | Implemented |
IC0297 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,288 | $1,336 | Implemented |
IC0297 # 16 Y:2024 | 16 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $57,855 | $47,950 | Not Implemented |
IC0297 # 11 Y:2024 | 11 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,441 | $13,680 | Not Implemented |
IC0297 # 09 Y:2024 | 09 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $983 | $378 | Not Implemented |
IC0297 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $2,641 | $1,066 | Implemented |
IC0297 # 13 Y:2024 | 13 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $4,854 | $360 | Implemented |
IC0297 # 12 Y:2024 | 12 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,395 | $609 | Implemented |
IC0297 # 10 Y:2024 | 10 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,801 | $0 | Implemented |
IC0297 # 15 Y:2024 | 15 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,222 | $0 | Implemented |
IP0178 # 01 Y:2023 | 01 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,915 | $824 | Not Implemented |
IP0178 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $5,185 | $20,824 | Not Implemented |
IP0178 # 03 Y:2023 | 03 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,674 | $4,752 | Not Implemented |