Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsNAICS | 3259 | Other Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2409 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $162,757 | $116,320 | n/a |
LS2409 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,382 | $165 | n/a |
LS2409 # 03 Y:2024 | 03 | 2024 | INSTALL SUB-METERING EQUIPMENT | $13,250 | $9,000 | n/a |
LS2409 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $11,502 | $18,750 | n/a |
LS2409 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,911 | $2,088 | n/a |
LS2409 # 05 Y:2024 | 05 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $18,443 | $20,000 | n/a |
LS2409 # 02 Y:2024 | 02 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $5,037 | $2,600 | n/a |
IC0297 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $26,122 | $13,370 | n/a |
IC0297 # 15 Y:2024 | 15 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,222 | $0 | n/a |
IC0297 # 05 Y:2024 | 05 | 2024 | USE OPTIMUM THICKNESS INSULATION | $2,433 | $1,693 | n/a |
IC0297 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,704 | $1,123 | n/a |
IC0297 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $289,074 | $1,202,972 | n/a |
IC0297 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $2,641 | $1,066 | n/a |
IC0297 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $5,801 | $2,620 | n/a |
IC0297 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,288 | $1,336 | n/a |
IC0297 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,754 | $36,000 | n/a |
IC0297 # 09 Y:2024 | 09 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $983 | $378 | n/a |
IC0297 # 10 Y:2024 | 10 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,801 | $0 | n/a |
IC0297 # 14 Y:2024 | 14 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $119 | $0 | n/a |
IC0297 # 16 Y:2024 | 16 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $57,855 | $47,950 | n/a |
IC0297 # 11 Y:2024 | 11 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,441 | $13,680 | n/a |
IC0297 # 13 Y:2024 | 13 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $4,854 | $360 | n/a |
IC0297 # 12 Y:2024 | 12 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,395 | $609 | n/a |
TT0309 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,336 | $20,480 | n/a |
TT0309 # 07 Y:2024 | 07 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,333 | $0 | n/a |