Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2024 |
Principal Product | Semiconductor Materials |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 185 |
Plant Area (Sq.Ft.) | 62,600 |
Annual Production | 12 Units |
Production Hrs. Annual | 6,120 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,178,437 | 7,491,443 | kWh | $0.29 |
Electricity Demand | $974,250 | 13,749 | kW-months/year | $70.86 |
Natural Gas | $361,040 | 45,900 | MMBtu | $7.87 |
TOTAL ENERGY COSTS | $4,551,127 | |||
RECOMMENDED SAVINGS* | $2,836,669 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $641,754 Cost: $589,764 |
$315,797 | 1,085,960 | $325,957 | 4,599 | - | - | - | - | - | - |
$315,797 1,085,960 kWh |
$325,957 4,599 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL |
Savings: $1,321,862 Cost: $54,390 |
$(-172,786) | (-594,176) | $1,494,648 | 21,090 | - | - | - | - | - | - |
$(-172,786) (-594,176) kWh |
$1,494,648 21,090 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,348 Cost: $676 |
$908 | 3,121 | $434 | 6 | - | - | - | - | $7 | - |
$908 3,121 kWh |
$434 6 kW-months/year |
- - MMBtu |
- - gal |
$7 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $3,584 Cost: $4,191 |
- | - | $3,584 | 51 | - | - | - | - | - | - |
- - kWh |
$3,584 51 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $10,205 Cost: - |
- | - | $10,205 | 144 | - | - | - | - | - | - |
- - kWh |
$10,205 144 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $2,354 Cost: - |
- | - | $2,354 | 33 | - | - | - | - | - | - |
- - kWh |
$2,354 33 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $854 Cost: $250 |
$854 | 2,935 | - | - | - | - | - | - | - | - |
$854 2,935 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $809,075 Cost: $47,546 |
$(-11,949) | (-41,090) | $(-5,710) | (-81) | - | - | $826,734 | 1,456,000 | - | - |
$(-11,949) (-41,090) kWh |
$(-5,710) (-81) kW-months/year |
- - MMBtu |
$826,734 1,456,000 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $17,243 Cost: $7,340 |
$5,192 | 17,854 | $12,051 | 170 | - | - | - | - | - | - |
$5,192 17,854 kWh |
$12,051 170 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,652 Cost: $2,148 |
$5,178 | 17,806 | $2,474 | 35 | - | - | - | - | - | - |
$5,178 17,806 kWh |
$2,474 35 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $970 Cost: $1,863 |
$656 | 2,257 | $314 | 4 | - | - | - | - | - | - |
$656 2,257 kWh |
$314 4 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $12,725 Cost: $11,775 |
- | - | - | - | $12,725 | 1,618 | - | - | - | - |
- - kWh |
- - kW-months/year |
$12,725 1,618 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,043 Cost: $19,842 |
$4,766 | 16,388 | $2,277 | 32 | - | - | - | - | - | - |
$4,766 16,388 kWh |
$2,277 32 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $2,836,669 Cost: $739,785 |
$148,615 | 511,055 | $1,848,588 | 26,084 | $12,725 | 1,618 | $826,734 | 1,456,000 | $7 | - | $148,615 511,055 kWh |
$1,848,588 26,084 kW-months/year |
$12,725 1,618 MMBtu |
$826,734 1,456,000 gal |
$7 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Ancillary Material Cost |