IAC logo
IAC Assessment: SD0661
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0661
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2024
Principal Product Semiconductor Materials
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $100,000,000-$500,000,000
# of Employees 185
Plant Area (Sq.Ft.) 62,600
Annual Production 12 Units
Production Hrs. Annual 6,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,178,437 7,491,443 kWh $0.29
Electricity Demand $974,250 13,749 kW-months/year $70.86
Natural Gas $361,040 45,900 MMBtu $7.87
TOTAL ENERGY COSTS $4,551,127
RECOMMENDED SAVINGS* $2,836,669 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$641,754
Cost:
$589,764
$315,797 1,085,960 $325,957 4,599 - - - - - - $315,797
1,085,960
kWh
$325,957
4,599
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$1,321,862
Cost:
$54,390
$(-172,786) (-594,176) $1,494,648 21,090 - - - - - - $(-172,786)
(-594,176)
kWh
$1,494,648
21,090
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,348
Cost:
$676
$908 3,121 $434 6 - - - - $7 - $908
3,121
kWh
$434
6
kW-months/year
-
-
MMBtu
-
-
gal
$7
-
$
04: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,584
Cost:
$4,191
- - $3,584 51 - - - - - - -
-
kWh
$3,584
51
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$10,205
Cost:
-
- - $10,205 144 - - - - - - -
-
kWh
$10,205
144
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,354
Cost:
-
- - $2,354 33 - - - - - - -
-
kWh
$2,354
33
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$854
Cost:
$250
$854 2,935 - - - - - - - - $854
2,935
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
08: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$809,075
Cost:
$47,546
$(-11,949) (-41,090) $(-5,710) (-81) - - $826,734 1,456,000 - - $(-11,949)
(-41,090)
kWh
$(-5,710)
(-81)
kW-months/year
-
-
MMBtu
$826,734
1,456,000
gal
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,243
Cost:
$7,340
$5,192 17,854 $12,051 170 - - - - - - $5,192
17,854
kWh
$12,051
170
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,652
Cost:
$2,148
$5,178 17,806 $2,474 35 - - - - - - $5,178
17,806
kWh
$2,474
35
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$970
Cost:
$1,863
$656 2,257 $314 4 - - - - - - $656
2,257
kWh
$314
4
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
12: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$12,725
Cost:
$11,775
- - - - $12,725 1,618 - - - - -
-
kWh
-
-
kW-months/year
$12,725
1,618
MMBtu
-
-
gal
-
-
$
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,043
Cost:
$19,842
$4,766 16,388 $2,277 32 - - - - - - $4,766
16,388
kWh
$2,277
32
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$2,836,669
Cost:
$739,785
$148,615 511,055 $1,848,588 26,084 $12,725 1,618 $826,734 1,456,000 $7 - $148,615
511,055
kWh
$1,848,588
26,084
kW-months/year
$12,725
1,618
MMBtu
$826,734
1,456,000
gal
$7
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Ancillary Material Cost