IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 325910 Printing Ink Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1064 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,680 $0 Not Implemented
UA0190 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $150 $258 Implemented
UA0190 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,588 $24,837 Not Implemented
UA0190 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $2,572 $1,253 Not Implemented
UA0190 # 03 Y:2018 03 2018 USE PHOTOCELL CONTROLS $2,331 $707 Implemented
UA0190 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,309 $2,048 Implemented
UA0190 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,642 $1,165 Implemented
UA0190 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,214 $250 Not Implemented
UA0190 # 07 Y:2018 07 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,316 $2,353 Not Implemented
UA0190 # 09 Y:2018 09 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,007 $1,612 Not Implemented
UD0970 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,577 $49,400 Not Implemented
UD0970 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $570 $0 Implemented
UD0970 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $164 $50 Not Implemented
UD0970 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $298 $1,000 Implemented
UD0970 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,745 $1,000 Not Implemented
UD0970 # 05 Y:2017 05 2017 ADD AREA LIGHTING SWITCHES $541 $250 Implemented
UD0970 # 04 Y:2017 04 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,698 $2,000 Not Implemented
UD0970 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $142 $0 Implemented
DL0098 # 01 Y:2012 01 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $92,987 $22,000 Implemented
DL0098 # 06 Y:2012 06 2012 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $700 $500 Not Implemented
DL0098 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,060 $4,880 Implemented
DL0098 # 04 Y:2012 04 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $10,500 $19,500 Implemented
DL0098 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,100 $18,000 Implemented
DL0098 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,900 $18,000 Implemented