Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,755
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0339 # 02 Y:2025 | 02 | 2025 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $33,333 | $35,000 | n/a |
TT0339 # 08 Y:2025 | 08 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,566 | $850 | n/a |
TT0339 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,795 | $10,920 | n/a |
TT0339 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,876 | $5,625 | n/a |
TT0339 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $22,030 | $20,000 | n/a |
TT0339 # 09 Y:2025 | 09 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $868 | $100 | n/a |
TT0339 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $49,796 | $276,634 | n/a |
TT0339 # 03 Y:2025 | 03 | 2025 | OPTIMIZE PLANT POWER FACTOR | $31,076 | $9,750 | n/a |
TT0339 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,575 | $11,250 | n/a |
NL0113 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $58,063 | $520 | n/a |
NL0113 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,978 | $3,292 | n/a |
NL0113 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $2,902 | $772 | n/a |
NL0113 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,107,096 | $3,374,250 | n/a |
NL0113 # 04 Y:2025 | 04 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $43,590 | $52,034 | n/a |
NL0113 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $374 | $500 | n/a |
NL0113 # 05 Y:2025 | 05 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,520 | $400 | n/a |
NL0113 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $542,223 | $1,261,250 | n/a |
MU0069 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,682 | $5,553 | n/a |
MU0069 # 06 Y:2025 | 06 | 2025 | KEEP EQUIPMENT CLEAN | $3,684 | $0 | n/a |
MU0069 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $339 | $581 | n/a |
MU0069 # 10 Y:2025 | 10 | 2025 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $188 | $1,500 | n/a |
MU0069 # 08 Y:2025 | 08 | 2025 | USE PHOTOCELL CONTROLS | $982 | $0 | n/a |
MU0069 # 07 Y:2025 | 07 | 2025 | USE PHOTOCELL CONTROLS | $1,214 | $754 | n/a |
MU0069 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $24,311 | $129,488 | n/a |
MU0069 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $674 | $120 | n/a |