Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,763
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0339 # 02 Y:2025 | 02 | 2025 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $33,333 | $35,000 | n/a |
TT0339 # 08 Y:2025 | 08 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,566 | $850 | n/a |
TT0339 # 09 Y:2025 | 09 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $868 | $100 | n/a |
TT0339 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,795 | $10,920 | n/a |
TT0339 # 03 Y:2025 | 03 | 2025 | OPTIMIZE PLANT POWER FACTOR | $31,076 | $9,750 | n/a |
TT0339 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,575 | $11,250 | n/a |
TT0339 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,876 | $5,625 | n/a |
TT0339 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $22,030 | $20,000 | n/a |
TT0339 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $49,796 | $276,634 | n/a |
NL0113 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $58,063 | $520 | n/a |
NL0113 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $374 | $500 | n/a |
NL0113 # 05 Y:2025 | 05 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,520 | $400 | n/a |
NL0113 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $2,902 | $772 | n/a |
NL0113 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,978 | $3,292 | n/a |
NL0113 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,107,096 | $3,374,250 | n/a |
NL0113 # 04 Y:2025 | 04 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $43,590 | $52,034 | n/a |
NL0113 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $542,223 | $1,261,250 | n/a |
NT0047 # 07 Y:2025 | 07 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,083 | $1,434 | n/a |
NT0047 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $26,918 | $27,300 | n/a |
NT0047 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $87,586 | $164,542 | n/a |
NT0047 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,099 | $4,224 | n/a |
NT0047 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $89,410 | $0 | n/a |
NT0047 # 04 Y:2025 | 04 | 2025 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $61,852 | $120,692 | n/a |
NT0047 # 08 Y:2025 | 08 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $852 | $0 | n/a |
NT0047 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $166,705 | $320,438 | n/a |