Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,572
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0853 # 01 Y:2008 | 01 | 2008 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $6,045 | $0 | Implemented |
GT0853 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,999 | $4,500 | Implemented |
GT0853 # 04 Y:2008 | 04 | 2008 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $7,123 | $3,000 | Implemented |
GT0853 # 08 Y:2008 | 08 | 2008 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $1,629 | $2,450 | Implemented |
GT0853 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $128,543 | $230,470 | Implemented |
OK0767 # 01 Y:2008 | 01 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $14,145 | $1,383 | Implemented |
OK0767 # 05 Y:2008 | 05 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,068 | $200 | Implemented |
OK0767 # 07 Y:2008 | 07 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $46,431 | $6,300 | Implemented |
OK0767 # 08 Y:2008 | 08 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,751 | $0 | Implemented |
IC0143 # 02 Y:2008 | 02 | 2008 | DISCONNECT BALLASTS | $26 | $26 | Implemented |
IC0143 # 03 Y:2008 | 03 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $338 | $0 | Implemented |
IC0143 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $162 | Implemented |
IC0143 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $142 | Implemented |
IC0143 # 06 Y:2008 | 06 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,385 | $1,541 | Implemented |
IC0143 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,544 | $1,035 | Implemented |
IC0143 # 09 Y:2008 | 09 | 2008 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,040 | $37 | Implemented |
IC0143 # 11 Y:2008 | 11 | 2008 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,202 | $32,361 | Implemented |
IC0143 # 12 Y:2008 | 12 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $541 | $0 | Implemented |
MI0170 # 01 Y:2008 | 01 | 2008 | INSULATE BARE EQUIPMENT | $61,285 | $976 | Implemented |
MI0170 # 02 Y:2008 | 02 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,359 | $3,320 | Implemented |
MI0170 # 03 Y:2008 | 03 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,311 | $13,680 | Implemented |
MI0170 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,299 | $1,210 | Implemented |
MI0170 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,909 | $3,370 | Implemented |
MI0170 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,474 | $40 | Implemented |
DL0014 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,600 | $0 | Implemented |