Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,570
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0406 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,075 | $5,674 | Implemented |
MI0406 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,550 | $2,031 | Implemented |
MI0406 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,468 | $15,450 | Implemented |
MI0406 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $5,579 | $15,821 | Implemented |
MI0406 # 06 Y:2022 | 06 | 2022 | ELIMINATE/REDUCE AN OPERATION | $4,770 | $960 | Implemented |
SF0583 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,948 | $240 | Implemented |
SF0583 # 02 Y:2022 | 02 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,046 | $2,379 | Implemented |
SF0583 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,181 | $30,438 | Implemented |
MA0837 # 01 Y:2022 | 01 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $13,524 | $1,250 | Implemented |
MA0837 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,317 | $2,500 | Implemented |
MA0837 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,956 | $500 | Implemented |
MA0837 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,463 | $625 | Implemented |
MA0837 # 06 Y:2022 | 06 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,316 | $600 | Implemented |
LE0517 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $603 | $40 | Implemented |
LE0517 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $52,000 | $100,000 | Implemented |
LE0517 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $125 | $480 | Implemented |
OK1065 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,073 | $12,233 | Implemented |
OK1065 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $29,263 | $0 | Implemented |
OK1065 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,433 | $2,429 | Implemented |
OK1065 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,273 | $21,539 | Implemented |
LS2206 # 01 Y:2022 | 01 | 2022 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,066 | $10 | Implemented |
LS2206 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,014 | $25 | Implemented |
LS2206 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,034 | $630 | Implemented |
LS2206 # 04 Y:2022 | 04 | 2022 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $336 | $250 | Implemented |
LS2206 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,272 | $2,688 | Implemented |