Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0027 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,618 | $2,442 | n/a |
CI0027 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $3,632 | $3,000 | n/a |
CI0027 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,620 | $0 | n/a |
CI0027 # 07 Y:2023 | 07 | 2023 | USE PHOTOCELL CONTROLS | $3,161 | $1,400 | n/a |
CI0027 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,655 | $500 | n/a |
UD1072 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,741 | $5,000 | Implemented |
UD1072 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,199 | $864 | Implemented |
UD1072 # 03 Y:2024 | 03 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $63 | $216 | Implemented |
UD1072 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,454 | $952 | Not Implemented |
UD1072 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,892 | $12,650 | Implemented |
UD1072 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,343 | $1,667 | Not Implemented |
UD1072 # 07 Y:2024 | 07 | 2024 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $14,674 | $67,830 | Not Implemented |
UD1071 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,375 | $11,280 | Implemented |
UD1071 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,777 | $1,275 | Not Implemented |
UD1071 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,691 | $0 | Not Implemented |
UD1071 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,651 | $1,800 | Implemented |
UD1071 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,111 | $952 | Implemented |
UD1071 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $60,417 | $127,158 | Not Implemented |
MZ0354 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,120 | $1,100 | n/a |
MZ0354 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,143 | $20,027 | n/a |
MZ0354 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $300 | n/a |
MZ0354 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $984 | $700 | n/a |
MZ0354 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $43,767 | $294,662 | n/a |
SJ0010 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $780 | $0 | Implemented |
SJ0010 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $58 | $0 | Implemented |