IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2306 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $30,055 $314,019 Not Implemented
UL2306 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $336 $600 Implemented
UL2211 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,815 $0 Implemented
UL2211 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $96,458 $783,531 Not Implemented
UL2211 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,806 $20,000 Not Implemented
UL2211 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,765 $0 Implemented
UL2211 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $61,887 $45,461 Implemented
UL2211 # 06 Y:2022 06 2022 USE SOLAR HEAT TO HEAT WATER $60,938 $150,000 Not Implemented
UL2211 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,600 $15,000 Not Implemented
UK1912 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $90,133 $6,406 Not Implemented
UK1912 # 09 Y:2019 09 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $86,767 $5,000 Implemented
UK1912 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,744 $8,695 Not Implemented
UK1912 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,364 $30,555 Implemented
UK1912 # 07 Y:2019 07 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $16,009 $41,650 Not Implemented
UK1912 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,541 $0 Implemented
UK1912 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,487 $2,150 Implemented
UK1912 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,123 $3,378 Not Implemented
UK1912 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,080 $363 Not Implemented
UK1805 # 08 Y:2018 08 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,637 $750 n/a
UK1805 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $409 $570 n/a
UK1805 # 04 Y:2018 04 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,147 $1,316 n/a
UK1805 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $2,317 $3,179 n/a
UK1805 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $288 $601 n/a
UK1805 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $338 $365 n/a
UK1805 # 06 Y:2018 06 2018 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $495 $1,250 n/a