IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0570 # 11 Y:2010 11 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $521 $490 Implemented
AM0570 # 12 Y:2010 12 2010 PAY BILLS ON TIME TO AVOID LATE FEES $120 $0 Implemented
DL0046 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,503 $0 Not Implemented
DL0046 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $2,940 $0 Not Implemented
DL0046 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $7,292 $520 Not Implemented
DL0046 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,168 $1,500 Implemented
DL0046 # 05 Y:2010 05 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,619 $10,000 Implemented
DL0046 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,295 $23,738 Implemented
DL0046 # 07 Y:2010 07 2010 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $785 $2,410 Not Implemented
BD0368 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,866 $25,159 Implemented
BD0368 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,960 $750 Not Implemented
BD0368 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $329 $410 Implemented
BD0368 # 04 Y:2010 04 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,981 $7,700 Not Implemented
BD0368 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,297 $2,500 Not Implemented
BD0368 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,857 $0 Implemented
SD0424 # 01 Y:2010 01 2010 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $67,934 $1,710 Implemented
SD0424 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,306 $7,308 Implemented
SD0424 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,177 $4,500 Implemented
SD0424 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,138 $14,750 Not Implemented
SD0424 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,815 $16,270 Not Implemented
SD0424 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,490 $10,074 Not Implemented
SD0424 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $8,162 $31,629 Not Implemented
MZ0045 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,876 $46,050 Implemented
MZ0045 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,746 $4,200 Not Implemented
MZ0045 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,734 $950 Implemented