IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0287 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,058 $1,840 Implemented
LE0287 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,998 $27,281 Not Implemented
MI0177 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,329 $2,000 Implemented
MI0177 # 02 Y:2009 02 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $31,195 $912 Not Implemented
MI0177 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,542 $16,140 Not Implemented
MI0177 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,954 $1,210 Implemented
MI0177 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,166 $40 Implemented
MI0177 # 06 Y:2009 06 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,006 $4,531 Not Implemented
MI0177 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,697 $1,210 Implemented
MI0177 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,199 $40 Implemented
MI0177 # 09 Y:2009 09 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,417 $4,531 Not Implemented
MI0177 # 10 Y:2009 10 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $8,226 $3,320 Implemented
OK0777 # 01 Y:2009 01 2009 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $164,328 $490,000 Implemented
OK0777 # 02 Y:2009 02 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $26,234 $0 Implemented
OK0777 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,889 $19,448 Not Implemented
OK0777 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,136 $3,129 Implemented
OK0777 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $28,753 $33,300 Implemented
OK0777 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,638 $779 Implemented
MZ0034 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,217 $1,000 Implemented
MZ0034 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $625 $650 Implemented
MZ0034 # 03 Y:2009 03 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,996 $0 Implemented
MZ0034 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,188 $32,000 Implemented
MZ0034 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $5,200 $532 Implemented
MZ0034 # 06 Y:2009 06 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,780 $3,000 Not Implemented
MZ0034 # 07 Y:2009 07 2009 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $13,376 $20,000 Implemented