IAC Assessment: MZ0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2009
Principal Product rubber transmition belts
NAICS 326220 - Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 185,000
Annual Production 10,000 Tons
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,099,132 17,291,129 kWh $0.06
Electricity Demand $536,354 39,036 kW-months/year $13.74
Natural Gas $974,244 104,272 MMBtu $9.34
TOTAL ENERGY COSTS $2,609,730
RECOMMENDED SAVINGS* $102,382 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,602
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$14,217
Cost:
$1,000
$14,217 184,635 - - $14,217
184,635
kWh
-
-
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$625
Cost:
$650
$625 15,400 - - $625
15,400
kWh
-
-
kW-months/year
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,996
Cost:
-
$3,996 51,660 - - $3,996
51,660
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,188
Cost:
$32,000
$25,188 238,680 - - $25,188
238,680
kWh
-
-
kW-months/year
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,200
Cost:
$532
$5,200 67,222 - - $5,200
67,222
kWh
-
-
kW-months/year
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$39,780
Cost:
$3,000
- - $39,780 2,994 -
-
kWh
$39,780
2,994
kW-months/year
07: 2.5196 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS Savings:
$13,376
Cost:
$20,000
$13,376 126,938 - - $13,376
126,938
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$102,382
Cost:
$57,182
$62,602 684,535 $39,780 2,994 $62,602
684,535
kWh
$39,780
2,994
kW-months/year
TOTAL IMPLEMENTED Savings:
$62,602
Cost:
$54,182
$62,602 684,535 - - $62,602
684,535
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand