Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0177 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,732 | $210 | Not Implemented |
IP0177 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $10,080 | $0 | Not Implemented |
IP0177 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,379 | $0 | Not Implemented |
IP0177 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,187 | $0 | Not Implemented |
IP0177 # 06 Y:2023 | 06 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $91,806 | $8,000 | Not Implemented |
IP0177 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,815 | $653 | Not Implemented |
IP0177 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $1,228 | $764 | Not Implemented |
IP0177 # 09 Y:2023 | 09 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,101 | $1,200 | Not Implemented |
IP0177 # 10 Y:2023 | 10 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,349 | $3,260 | Not Implemented |
IP0177 # 11 Y:2023 | 11 | 2023 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $409,614 | $304,570 | Not Implemented |
IP0177 # 12 Y:2023 | 12 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,714 | $17,391 | Not Implemented |
WV0652 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $193,156 | $160,000 | Not Implemented |
WV0652 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,958 | $210,200 | Not Implemented |
WV0652 # 03 Y:2023 | 03 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $22,798 | $1,500 | Implemented |
WV0652 # 04 Y:2023 | 04 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,975 | $1,500 | Implemented |
WV0652 # 05 Y:2023 | 05 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $13,792 | $1,942 | Implemented |
WV0652 # 06 Y:2023 | 06 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $8,659 | $22,700 | Not Implemented |
WV0652 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,902 | $2,750 | Implemented |
WV0652 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,967 | $2,160 | Implemented |
WV0652 # 09 Y:2023 | 09 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,118 | $7,210 | Implemented |
WV0652 # 10 Y:2023 | 10 | 2023 | INSULATE BARE EQUIPMENT | $506 | $166 | Implemented |
CI0020 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $92,262 | $487,880 | n/a |
CI0020 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $76,570 | $180,000 | n/a |
CI0020 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $55,349 | $45,000 | n/a |
CI0020 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,503 | $2,870 | n/a |