IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0099 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,725 $55 Not Implemented
TA0099 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,090 $600 Not Implemented
TA0099 # 06 Y:2005 06 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,170 $1,575 Not Implemented
TA0099 # 07 Y:2005 07 2005 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,010 $0 Not Implemented
TA0099 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $870 $325 Not Implemented
MI0109 # 01 Y:2005 01 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $30,000 $20,000 Not Implemented
MI0109 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,226 $1,350 Not Implemented
MI0109 # 03 Y:2005 03 2005 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,803 $560 Not Implemented
MI0109 # 04 Y:2005 04 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,952 $400 Not Implemented
MI0109 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $4,352 $1,010 Not Implemented
MI0109 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $3,825 $346 Not Implemented
MI0109 # 07 Y:2005 07 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $828 $0 Not Implemented
MI0109 # 08 Y:2005 08 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $685 $156 Not Implemented
MI0109 # 09 Y:2005 09 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,606 $23,253 Not Implemented
OK0712 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,981 $11,356 Not Implemented
OK0712 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,669 $7,920 Not Implemented
OK0712 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,357 $23,560 Not Implemented
OK0712 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $672 $1,820 Not Implemented
OK0712 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,800 $5,000 Not Implemented
OK0712 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $39,487 $48,800 Not Implemented
OK0712 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,142 $860 Not Implemented
OK0712 # 08 Y:2005 08 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,000 $3,000 Not Implemented
OK0712 # 09 Y:2005 09 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,026 $3,377 Not Implemented
OK0712 # 10 Y:2005 10 2005 INSTALL TIMERS AND/OR THERMOSTATS $1,512 $660 Not Implemented
OK0712 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,871 $1,327 Not Implemented