IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0012 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $25,256 $31 Implemented
MU0012 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,977 $0 Not Implemented
MU0012 # 03 Y:2022 03 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $711 $90 Not Implemented
MU0012 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $543 $313 Not Implemented
MU0012 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $453 $124 Not Implemented
MU0012 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $415 $485 Not Implemented
MU0012 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $425 Implemented
MU0012 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $344 $80 Not Implemented
MU0012 # 09 Y:2022 09 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $158 $99 Not Implemented
MU0012 # 10 Y:2022 10 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $132 $0 Not Implemented
MU0012 # 11 Y:2022 11 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $95 $0 Not Implemented
MU0012 # 12 Y:2022 12 2022 USE OPTIMUM TEMPERATURE $42 $0 Not Implemented
DL0210 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $41,792 $0 Not Implemented
DL0210 # 02 Y:2022 02 2022 INSTALL SET-BACK TIMERS $14,339 $1,650 Implemented
DL0210 # 03 Y:2022 03 2022 INSTALL SET-BACK TIMERS $4,951 $2,500 Implemented
DL0210 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $264,494 $0 Not Implemented
DL0210 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $93,984 $5,553 Not Implemented
DL0210 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN WATER LINES AND VALVES $17,648 $50,000 Not Implemented
DL0210 # 07 Y:2022 07 2022 REDUCE EXCESSIVE BOILER BLOWDOWN $17,995 $0 Not Implemented
DL0210 # 08 Y:2022 08 2022 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,443 $20,000 Not Implemented
DL0210 # 09 Y:2022 09 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $86,400 $1,000,000 Not Implemented
AM0853 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $74,850 $5,000 Implemented
AM0853 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $17,040 $19,415 Not Implemented
AM0853 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,530 $13,140 Implemented
AM0853 # 04 Y:2022 04 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,455 $4,175 Not Implemented