Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
452
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0377 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $1,242 | $1,042 | Not Implemented |
MI0377 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,479 | $1,875 | Not Implemented |
MI0377 # 06 Y:2020 | 06 | 2020 | AIR CONDITION ONLY SPACE NECESSARY | $1,976 | $4,415 | Not Implemented |
MI0377 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,125 | $2,048 | Not Implemented |
MI0377 # 04 Y:2020 | 04 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $3,560 | $17,760 | Not Implemented |
MI0377 # 03 Y:2020 | 03 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,058 | $1,306 | Not Implemented |
MI0377 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,215 | $2,100 | Not Implemented |
MI0377 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,975 | $1,980 | Not Implemented |
UF0531 # 01 Y:2019 | 01 | 2019 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $19,490 | $2,150 | Implemented |
UF0531 # 02 Y:2019 | 02 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $18,581 | $89,000 | Implemented |
UF0531 # 03 Y:2019 | 03 | 2019 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $17,787 | $43,500 | Implemented |
UF0531 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $2,473 | $7,866 | Implemented |
UF0531 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $2,072 | $195 | Implemented |
UF0531 # 06 Y:2019 | 06 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $1,675 | $667 | Implemented |
UF0525 # 01 Y:2019 | 01 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,580 | $31,585 | Implemented |
UF0525 # 02 Y:2019 | 02 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $13,500 | $33,800 | Not Implemented |
UF0525 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,245 | $18,331 | Implemented |
UF0525 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,084 | $4,798 | Implemented |
UF0525 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,145 | $3,960 | Implemented |
UF0525 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,312 | $464 | Implemented |
UF0525 # 07 Y:2019 | 07 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $1,061 | $2,108 | Not Implemented |
UF0525 # 08 Y:2019 | 08 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $35,380 | $15,216 | Not Implemented |
UF0525 # 09 Y:2019 | 09 | 2019 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $34,636 | $10,000 | Not Implemented |
UF0524 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $371,464 | $1,750,000 | Not Implemented |
UF0524 # 02 Y:2019 | 02 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $212,420 | $75,000 | Not Implemented |