Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0241 # 04 Y:2020 | 04 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $18,441 | $75,000 | Implemented |
TT0241 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,106 | $530 | Implemented |
TT0241 # 06 Y:2020 | 06 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $4,203 | $120 | Not Implemented |
TT0241 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,304 | $3,360 | Implemented |
TT0241 # 08 Y:2020 | 08 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,202 | $20 | Implemented |
TT0241 # 09 Y:2020 | 09 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,651 | $6,000 | Implemented |
TT0241 # 10 Y:2020 | 10 | 2020 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $404 | $1,000 | Implemented |
TT0241 # 11 Y:2020 | 11 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $307 | $680 | Implemented |
TT0241 # 12 Y:2020 | 12 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $74 | $269 | Implemented |
BS0137 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,104 | $0 | Implemented |
BS0137 # 02 Y:2020 | 02 | 2020 | REDUCE VENTILATION AIR | $2,625 | $7,998 | Not Implemented |
BS0137 # 03 Y:2020 | 03 | 2020 | UPGRADE OBSOLETE EQUIPMENT | $4,702 | $21,000 | Not Implemented |
BS0137 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $1,055 | $1,765 | Not Implemented |
BS0137 # 05 Y:2020 | 05 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,551 | $13,500 | Not Implemented |
BS0137 # 06 Y:2020 | 06 | 2020 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $14,705 | $45,023 | Not Implemented |
IP0138 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,642 | $0 | Not Implemented |
IP0138 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $296 | $0 | Not Implemented |
IP0138 # 03 Y:2020 | 03 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,178 | $425 | Not Implemented |
IP0138 # 04 Y:2020 | 04 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,110 | $4,000 | Not Implemented |
IP0138 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,920 | $3,260 | Not Implemented |
IP0138 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,582 | $32,713 | Not Implemented |
TR0027 # 01 Y:2020 | 01 | 2020 | USE OPTIMUM THICKNESS INSULATION | $5,150 | $2,324 | Implemented |
TR0027 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,123 | $1,562 | Implemented |
TR0027 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,856 | $4,480 | Implemented |
TR0027 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $44 | $60 | Implemented |