IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

452

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0306 # 09 Y:2017 09 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,238 $650 Implemented
MI0306 # 10 Y:2017 10 2017 INSTALL OCCUPANCY SENSORS $1,858 $177 Implemented
MI0306 # 11 Y:2017 11 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $711 $120 Implemented
MI0306 # 12 Y:2017 12 2017 INSTALL OCCUPANCY SENSORS $612 $1,630 Implemented
MI0295 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,797 $59,670 Not Implemented
MI0295 # 02 Y:2016 02 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $26,678 $80,000 Not Implemented
MI0295 # 03 Y:2016 03 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,275 $4,471 Not Implemented
MI0295 # 04 Y:2016 04 2016 USE PHOTOCELL CONTROLS $11,307 $10,380 Not Implemented
MI0295 # 05 Y:2016 05 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,874 $40 Not Implemented
MI0295 # 06 Y:2016 06 2016 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $7,334 $4,411 Not Implemented
MI0295 # 07 Y:2016 07 2016 PAY UTILITY BILLS ON TIME $4,723 $0 Not Implemented
MI0295 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,957 $1,660 Not Implemented
MI0295 # 09 Y:2016 09 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,084 $320 Not Implemented
MI0295 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $1,284 $683 Not Implemented
MI0295 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $448 $640 Not Implemented
MI0292 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,353 $95,355 Implemented
MI0292 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,595 $1,660 Implemented
MI0292 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,974 $40 Not Implemented
MI0292 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,028 $8,642 Not Implemented
MI0292 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,106 $884 Implemented
MI0292 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,562 $1,832 Not Implemented
MI0292 # 07 Y:2016 07 2016 USE OPTIMUM THICKNESS INSULATION $2,670 $1,810 Implemented
MI0292 # 08 Y:2016 08 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,585 $670 Not Implemented
MI0292 # 09 Y:2016 09 2016 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,313 $480 Not Implemented
MI0292 # 10 Y:2016 10 2016 USE PHOTOCELL CONTROLS $183 $480 Implemented