IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2405 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,198 $1,300 n/a
UC2405 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $410 $1,310 n/a
UC2405 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,826 $30 n/a
UC2405 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $30,199 $266,755 n/a
UC2405 # 01 Y:2024 01 2024 PAY UTILITY BILLS ON TIME $299 $0 n/a
UC2405 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,409 $1,997 n/a
UC2405 # 07 Y:2024 07 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,288 $31,098 n/a
UC2405 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $3,906 $30,482 n/a
MA0853 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,785 $16,025 Not Implemented
MA0853 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,946 $949 Not Implemented
MA0853 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,202 $18,988 Implemented
MA0853 # 03 Y:2023 03 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,672 $30,500 Implemented
MA0853 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,613 $59,377 Implemented
MA0853 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,336 $24,300 Implemented
MA0837 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,463 $625 Implemented
MA0837 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,317 $2,500 Implemented
MA0837 # 03 Y:2022 03 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,507 $46,265 Not Implemented
MA0837 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,524 $1,250 Implemented
MA0837 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,956 $500 Implemented
MA0837 # 06 Y:2022 06 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,316 $600 Implemented
MA0829 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $6,782 $8,620 Not Implemented
MA0829 # 01 Y:2022 01 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,736 $24,400 Not Implemented
MA0829 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,700 $4,400 Implemented
MA0829 # 04 Y:2022 04 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,485 $1,000 Not Implemented
MA0829 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,278 $15,850 Not Implemented