IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

531

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0010 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $9,629 $1,369 Implemented
SJ0010 # 03 Y:2024 03 2024 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $626 $0 Not Implemented
SJ0010 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $58 $0 Implemented
SJ0010 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $0 Implemented
SJ0007 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $128,947 $765,487 Not Implemented
SJ0007 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,271 $13,090 Not Implemented
SJ0007 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $495 Not Implemented
SJ0007 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $192 $0 Not Implemented
SJ0007 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,529 $0 Not Implemented
SJ0007 # 06 Y:2023 06 2023 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $31,866 $36,311 Not Implemented
SJ0007 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47,492 $0 Not Implemented
SJ0007 # 08 Y:2023 08 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,635 $0 Not Implemented
CI0020 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $76,570 $180,000 n/a
CI0020 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $55,349 $45,000 n/a
CI0020 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,503 $2,870 n/a
CI0020 # 05 Y:2023 05 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,187 $20,000 n/a
CI0020 # 06 Y:2023 06 2023 USE PHOTOCELL CONTROLS $1,246 $750 n/a
CI0020 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $92,262 $487,880 n/a
SD0627 # 08 Y:2023 08 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,281 $41,842 Not Implemented
SD0627 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $634 $2,128 Not Implemented
SD0627 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,041 $48,250 Not Implemented
SD0627 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,383 $164,701 Not Implemented
SD0627 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,584 $7,660 Not Implemented
SD0627 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,101 $9,714 Not Implemented
SD0627 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,072 $2,788 Not Implemented