Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
169
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0577 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,313 | $5,306 | Implemented |
WV0577 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,439 | $0 | Implemented |
WV0577 # 04 Y:2019 | 04 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $9,446 | $1,823 | Implemented |
WV0577 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,672 | $25,000 | Not Implemented |
WV0577 # 02 Y:2019 | 02 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $11,817 | $1,000 | Implemented |
WV0577 # 01 Y:2019 | 01 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $20,384 | $16,000 | Not Implemented |
WV0570 # 05 Y:2019 | 05 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $7,457 | $30,875 | Not Implemented |
WV0570 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $122,928 | $148,200 | Not Implemented |
WV0570 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,683 | $2,990 | Implemented |
WV0570 # 03 Y:2019 | 03 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $15,386 | $868 | Implemented |
WV0570 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,976 | $468 | Implemented |
WV0570 # 06 Y:2019 | 06 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,692 | $1,000 | Implemented |
WV0570 # 07 Y:2019 | 07 | 2019 | INSULATE BARE EQUIPMENT | $1,056 | $247 | Implemented |
WV0570 # 08 Y:2019 | 08 | 2019 | MINIMIZE WATER USAGE | $2,057 | $1,050 | Not Implemented |
WV0543 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,457 | $5,365 | Not Implemented |
WV0543 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,860 | $17,381 | Implemented |
WV0543 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,251 | $8,510 | Implemented |
WV0543 # 03 Y:2017 | 03 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,081 | $0 | Not Implemented |
WV0543 # 04 Y:2017 | 04 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,688 | $1,000 | Not Implemented |
WV0543 # 05 Y:2017 | 05 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,262 | $839 | Not Implemented |
WV0543 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,262 | $256 | Implemented |
WV0543 # 11 Y:2017 | 11 | 2017 | INSTALL SET-BACK TIMERS | $164 | $765 | Not Implemented |
WV0543 # 10 Y:2017 | 10 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $700 | $39 | Implemented |
WV0543 # 08 Y:2017 | 08 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $988 | $1,050 | Not Implemented |
WV0543 # 09 Y:2017 | 09 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $755 | $542 | Implemented |